ITAC Assessment: SD0677
ITAC logo
ITAC Assessment: SD0677
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Lateral Flow, OTC & POC Test Kits
NAICS 325413: In-Vitro Diagnostic Substance Manufacturing
SIC 3841: Surgical and Medical Instruments and Apparatus
Sales Range $50
M
to 100
M
# of Employees 25
Plant Area 27,000
ft2
Annual Production 221,618
pieces
Production Hrs. Annual 4,950
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $75,599 221,166
kWh
Electricity Demand $44,409 826
kW-mo/yr
TOTAL YEARLY COSTS $120,008
RECOMMENDED SAVINGS* $91,131 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.9114: Use solar heat to make electricty $43,986 $59,050 $43,986
128,690
kWh
-
02 2.3141: Use battery storage for demand control $22,813 $1,191 $(-2,016.9)
(-5,901)
kWh
$24,830
-
kW-mo/yr
03 2.7233: Use properly designed and sized hvac equipment $10,792 $133,100 $10,792
31,573
kWh
-
04 2.2437: Recover waste heat from equipment $1,402 $4,350 $1,153
3,373
kWh
$249
-
kW-mo/yr
05 2.4231: Reduce the pressure of compressed air to the minimum required $2,718 - $2,718
7,953
kWh
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $3,337 $2,362 $2,060
6,027
kWh
$1,277
-
kW-mo/yr
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,175 $5,179 $2,175
6,363
kWh
-
08 2.4221: Install compressor air intakes in coolest locations $3,908 $11,010 $684
2,000
kWh
$3,224
-
kW-mo/yr
TOTAL RECOMMENDED $91,131 $216,242 $61,551
180,078
kWh
$29,580
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs