ITAC Assessment: LS2314
ITAC logo
ITAC Assessment: LS2314
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Sugar
NAICS 311314: Cane Sugar Manufacturing
SIC 2062: Cane Sugar Refining
Sales Range $100
M
to 500
M
# of Employees 400
Plant Area 441,000
ft2
Annual Production 2,000,000,000
lb
Production Hrs. Annual 8,736
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,131,609 23,284,800
kWh
Natural Gas $7,477,584 2,459,035
MMBtu
TOTAL YEARLY COSTS $9,609,193
RECOMMENDED SAVINGS* $86,077 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $17,365

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7124: Make a practice of turning off lights when not needed $1,310 - $1,310
14,240
kWh
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,404 $135 $3,404
37,002
kWh
-
03 2.2511: Insulate bare equipment $3,222 $660 - $3,222
-
MMBtu
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $12,651 $11,390 $12,651
137,509
kWh
-
05 2.4133: Use most efficient type of electric motors $25,291 $89,400 $25,291
274,901
kWh
-
06 2.9114: Use solar heat to make electricty $40,199 $309,000 $40,199
436,951
kWh
-
TOTAL RECOMMENDED $86,077 $410,585 $82,855
900,603
kWh
$3,222
-
MMBtu
TOTAL IMPLEMENTED $17,365 $11,525 $17,365
188,751
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs