ITAC Assessment: IP0141
ITAC logo
ITAC Assessment: IP0141
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Pharmaceuticals
NAICS 325413: In-Vitro Diagnostic Substance Manufacturing
SIC 2834: Pharmaceutical Preparations
Sales Range $10
M
to 50
M
# of Employees 30
Plant Area 8,400
ft2
Annual Production 90,000,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $106,689 2,383,699
kWh
Electricity Demand $119,022 4,312
kW-mo/yr
Electricity Fees $32,897 -
Natural Gas $42,391 7,864
MMBtu
Waste Disposal Costs
Water Usage $15,067 4,099
Tgal
Water Disposal $47,319 6,882
Tgal
TOTAL YEARLY COSTS $363,385
RECOMMENDED SAVINGS* $20,579 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $17,374

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.7221: Lower temperature during the winter season and vice-versa $298 - $268
5,770
kWh
- - $30
-
MMBtu
02 2.4322: Use or replace with energy efficient substitutes $609 - $331
7,118
kWh
$278
-
kW-mo/yr
- -
03 4.812: Apply for investment incentives $15,156 $10,000 - - $15,156 -
04 4.812: Apply for investment incentives $2,218 $2,000 - - $2,218 -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $2,298 $5,206 $929
19,974
kWh
$1,369
-
kW-mo/yr
- -
TOTAL RECOMMENDED $20,579 $17,206 $1,528
32,862
kWh
$1,647
-
kW-mo/yr
$17,374 $30
-
MMBtu
TOTAL IMPLEMENTED $17,374 $12,000 - - $17,374 -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs