ITAC Assessment: KU0364
ITAC logo
ITAC Assessment: KU0364
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product HAMBURGER BUNS
NAICS
n/a
SIC 2051: Bread and Other Bakery Products, Except Cookies and Crackers
Sales Range $10
M
to 50
M
# of Employees 45
Plant Area
n/a
Annual Production 16,000,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $246,489 4,580,598
kWh
Natural Gas $86,620 20,243
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $38,848 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,263

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.2621: Modify refrigeration system to operate at a lower pressure $24,869 $10,000 $24,869
462,192
kWh
- -
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $6,102 $2,000 $6,102
113,423
kWh
- -
03 2.3212: Optimize plant power factor $4,116 $2,408 $4,116
-
kWh
- -
04 2.6232: Install set-back timers $568 $400 $568
10,551
kWh
- -
05 2.4133: Use most efficient type of electric motors $484 $771 $484
4,982
kWh
- -
06 2.1232: Keep boiler tubes clean $561 $135 - $561
-
MMBtu
-
07 2.7142: Utilize higher efficiency lamps and/or ballasts $177 - $227
4,103
kWh
- $(-50.0)
08 2.7111: Reduce illumination to minimum necessary levels $599 $150 $599
11,137
kWh
- -
09 2.7142: Utilize higher efficiency lamps and/or ballasts $1,372 $3,990 $1,372
25,498
kWh
- -
TOTAL RECOMMENDED $38,848 $19,854 $38,337
631,886
kWh
$561
-
MMBtu
$(-50.0)
TOTAL IMPLEMENTED $11,263 $5,314 $10,702
118,405
kWh
$561
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs