154
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | Medicinal and botanical manufacturing | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| CL1903 #02 Y:2018 | 02 | 2018 | Use adjustable frequency drive or multiple speed motors on existing system | $74,869 | $246,400 | |
| CL1903 #01 Y:2018 | 01 | 2018 | Utilize higher efficiency lamps and/or ballasts | $2,099 | $450 | |
| WM0115 #05 Y:2017 | 05 | 2017 | Utilize higher efficiency lamps and/or ballasts | $212 | $550 | |
| WM0115 #04 Y:2017 | 04 | 2017 | Utilize higher efficiency lamps and/or ballasts | $1,509 | $3,740 | |
| WM0115 #03 Y:2017 | 03 | 2017 | Use solar heat to make electricty | $7,532 | $17,600 | |
| WM0115 #02 Y:2017 | 02 | 2017 | Meter recycled water (to reduce sewer charges) | $7,812 | $810 | |
| WM0115 #01 Y:2017 | 01 | 2017 | Use synthetic lubricant | $11,231 | $17,756 | |
| OR0691 #04 Y:2017 | 04 | 2017 | Eliminate leaks in inert gas and compressed air lines/ valves | $955 | $1,955 | |
| OR0691 #03 Y:2017 | 03 | 2017 | Utilize higher efficiency lamps and/or ballasts | $772 | $4,048 | |
| OR0691 #02 Y:2017 | 02 | 2017 | Analyze flue gas for proper air/fuel ratio | $5,762 | $1,200 | |
| OR0691 #01 Y:2017 | 01 | 2017 | Replace existing equipment with more suitable substitutes | $220,769 | $39,442 | |
| UU0119 #09 Y:2017 | 09 | 2017 | Install occupancy sensors | $127 | $240 | |
| UU0119 #08 Y:2017 | 08 | 2017 | Combine utility meters | $657 | $1,125 | |
| UU0119 #07 Y:2017 | 07 | 2017 | Regrind, reuse, or sell scrap plastic parts | $1,100 | - | |
| UU0119 #06 Y:2017 | 06 | 2017 | Replace electrically-operated equipment with fossil fuel equipment | $1,324 | $3,000 | |
| UU0119 #05 Y:2017 | 05 | 2017 | Utilize higher efficiency lamps and/or ballasts | $2,903 | $2,472 | |
| UU0119 #04 Y:2017 | 04 | 2017 | Purchase gas directly from a contract gas supplier | $2,918 | - | |
| UU0119 #03 Y:2017 | 03 | 2017 | Reschedule plant operations or reduce load to avoid peaks | $4,428 | - | |
| UU0119 #02 Y:2017 | 02 | 2017 | Optimize plant power factor | $4,431 | $4,250 | |
| UU0119 #01 Y:2017 | 01 | 2017 | Replace electrically-operated equipment with fossil fuel equipment | $5,742 | $3,975 |