Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

154

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Medicinal and botanical manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
CL1903 #02 Y:2018 Use adjustable frequency drive or multiple speed motors on existing system $74,869 $246,400
CL1903 #01 Y:2018 Utilize higher efficiency lamps and/or ballasts $2,099 $450
WM0115 #05 Y:2017 Utilize higher efficiency lamps and/or ballasts $212 $550
WM0115 #04 Y:2017 Utilize higher efficiency lamps and/or ballasts $1,509 $3,740
WM0115 #03 Y:2017 Use solar heat to make electricty $7,532 $17,600
WM0115 #02 Y:2017 Meter recycled water (to reduce sewer charges) $7,812 $810
WM0115 #01 Y:2017 Use synthetic lubricant $11,231 $17,756
OR0691 #04 Y:2017 Eliminate leaks in inert gas and compressed air lines/ valves $955 $1,955
OR0691 #03 Y:2017 Utilize higher efficiency lamps and/or ballasts $772 $4,048
OR0691 #02 Y:2017 Analyze flue gas for proper air/fuel ratio $5,762 $1,200
OR0691 #01 Y:2017 Replace existing equipment with more suitable substitutes $220,769 $39,442
UU0119 #09 Y:2017 Install occupancy sensors $127 $240
UU0119 #08 Y:2017 Combine utility meters $657 $1,125
UU0119 #07 Y:2017 Regrind, reuse, or sell scrap plastic parts $1,100 -
UU0119 #06 Y:2017 Replace electrically-operated equipment with fossil fuel equipment $1,324 $3,000
UU0119 #05 Y:2017 Utilize higher efficiency lamps and/or ballasts $2,903 $2,472
UU0119 #04 Y:2017 Purchase gas directly from a contract gas supplier $2,918 -
UU0119 #03 Y:2017 Reschedule plant operations or reduce load to avoid peaks $4,428 -
UU0119 #02 Y:2017 Optimize plant power factor $4,431 $4,250
UU0119 #01 Y:2017 Replace electrically-operated equipment with fossil fuel equipment $5,742 $3,975