Assessment Year 2017
Principal Product Thrombin API (coagulant)
NAICS 325411: Medicinal and Botanical Manufacturing
SIC 2836: Biological Products, Except Diagnostic Substances
Sales Range $10
M
to 50
M
# of Employees 40
Plant Area 70,200
ft2
Annual Production 90,000
pieces
Production Hrs. Annual 2,080
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $133,535 3,991,614
kWh
Electricity Demand $89,190 7,778
kW-mo/yr
Electricity Fees $83,048 -
Natural Gas $141,799 30,082
MMBtu
Waste Disposal Costs
Water Disposal $152,622 134,002
Tgal
TOTAL YEARLY COSTS $600,194
RECOMMENDED SAVINGS* $28,296 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Disposal Savings
01 2.4314: Use synthetic lubricant $11,231 $17,756 $986
29,474
kWh
$10,245
-
kW-mo/yr
-
02 3.4116: Meter recycled water (to reduce sewer charges) $7,812 $810 - - $7,812
-
Tgal
03 2.9114: Use solar heat to make electricty $7,532 $17,600 $7,532
225,198
kWh
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,509 $3,740 $647
19,344
kWh
$862
-
kW-mo/yr
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $212 $550 $212
6,351
kWh
- -
TOTAL RECOMMENDED $28,296 $40,456 $9,377
280,367
kWh
$11,106
-
kW-mo/yr
$7,812
-
Tgal
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs