ITAC Assessment: MS0042
ITAC logo
ITAC Assessment: MS0042
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Plastic Products
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 120
Plant Area 176,000
ft2
Annual Production 16,000,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $609,035 11,282,532
kWh
Natural Gas $11,505 1,755
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $99,775 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $99,775

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.3212: Optimize plant power factor $64,604 $60,000 $64,604
-
kWh
-
02 2.3131: Reschedule plant operations or reduce load to avoid peaks $12,635 - $12,635
-
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $348 $778 $348
5,862
kWh
-
04 2.2437: Recover waste heat from equipment $1,264 $4,785 - $1,264
-
MMBtu
05 2.7124: Make a practice of turning off lights when not needed $13,524 $1,400 $13,524
444,314
kWh
-
06 2.7231: Use radiant heater for spot heating $7,400 $3,132 - $7,400
-
MMBtu
TOTAL RECOMMENDED $99,775 $70,095 $91,111
450,176
kWh
$8,664
-
MMBtu
TOTAL IMPLEMENTED $99,775 $70,095 $91,111
450,176
kWh
$8,664
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs