ITAC Assessment: OR0691
ITAC logo
ITAC Assessment: OR0691
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Methylsulfonylmethane (MSM)
NAICS 325411: Medicinal and Botanical Manufacturing
SIC 2833: Medicinal Chemicals and Botanical Products
Sales Range $5
M
to 10
M
# of Employees 22
Plant Area 31,000
ft2
Annual Production 5,445,418
lb
Production Hrs. Annual 6,240
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $47,150 1,076,480
kWh
Electricity Demand $27,987 4,134
kW-mo/yr
Electricity Fees $4,682 -
Natural Gas $38,844 10,142
MMBtu
TOTAL YEARLY COSTS $118,663
RECOMMENDED SAVINGS* $228,258 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,717

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings Ancillary Material Cost Savings Increase in Production Savings
01 4.652: Replace existing equipment with more suitable substitutes $220,769 $39,442 - - - - - $220,769
02 2.1233: Analyze flue gas for proper air/fuel ratio $5,762 $1,200 - - $5,762
-
MMBtu
- - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $772 $4,048 $625
14,277
kWh
$186
-
kW-mo/yr
- $194 $(-233.0) -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $955 $1,955 $690
15,748
kWh
$265
-
kW-mo/yr
- - - -
TOTAL RECOMMENDED $228,258 $46,645 $1,315
30,025
kWh
$451
-
kW-mo/yr
$5,762
-
MMBtu
$194 $(-233.0) $220,769
TOTAL IMPLEMENTED $6,717 $3,155 $690
15,748
kWh
$265
-
kW-mo/yr
$5,762
-
MMBtu
- - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs