| Assessment Year | 1990 |
|---|---|
| Principal Product | LATEX POLYMERS ETC. |
| NAICS |
n/a
|
| SIC | 2899: Chemicals and Chemical Preparations, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 22 |
| Plant Area |
n/a
|
| Annual Production | 400
Tgal
|
| Production Hrs. Annual | 4,000
hrs
|
| Location (State) | Connecticut |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $74,438 | 920,281 |
kWh
|
$0.081 |
| Fuel Oil #2 | $13,975 | 2,744 |
MMBtu
|
$5.09 |
| Fuel Oil #6 | $53,027 | 15,717 |
MMBtu
|
$3.37 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $4,431 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $1,565 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Fuel Oil #6 Savings |
|---|---|---|---|---|---|---|
| 01 | 2.7221: Lower temperature during the winter season and vice-versa | $1,218 | - |
$1,218
14,947
kWh
|
- | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,375 | $5,203 |
$1,375
16,999
kWh
|
- | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $119 | $96 |
$119
1,465
kWh
|
- | |
| 04 | 2.2122: Install / repair insulation on condensate lines | $273 | $419 | - |
$273
-
MMBtu
|
|
| 05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,446 | $100 |
$1,446
17,878
kWh
|
- | |
| TOTAL RECOMMENDED | $4,431 | $5,818 |
$4,158
51,289
kWh
|
$273
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $1,565 | $196 |
$1,565
19,343
kWh
|
- | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs