ITAC Assessment: MA0183
ITAC logo
ITAC Assessment: MA0183
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product LATEX POLYMERS ETC.
NAICS
n/a
SIC 2899: Chemicals and Chemical Preparations, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 22
Plant Area
n/a
Annual Production 400
Tgal
Production Hrs. Annual 4,000
hrs
Location (State) Connecticut

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $74,438 920,281
kWh
Fuel Oil #2 $13,975 2,744
MMBtu
Fuel Oil #6 $53,027 15,717
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $4,431 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,565

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #6 Savings
01 2.7221: Lower temperature during the winter season and vice-versa $1,218 - $1,218
14,947
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,375 $5,203 $1,375
16,999
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $119 $96 $119
1,465
kWh
-
04 2.2122: Install / repair insulation on condensate lines $273 $419 - $273
-
MMBtu
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,446 $100 $1,446
17,878
kWh
-
TOTAL RECOMMENDED $4,431 $5,818 $4,158
51,289
kWh
$273
-
MMBtu
TOTAL IMPLEMENTED $1,565 $196 $1,565
19,343
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs