Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

40

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Fertilizer (mixing only) manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
LE0584 #08 Y:2024 Preheat combustion air with waste heat $8,045 $30,000
LE0584 #07 Y:2024 Clean or color roof to reduce solar load $9,000 $31,500
LE0584 #06 Y:2024 Analyze flue gas for proper air/fuel ratio $1,853 $5,000
LE0584 #05 Y:2024 Install back-up equipment $148,846 $350,000
LE0584 #04 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $1,377 $2,400
LE0584 #03 Y:2024 Install timers and/or thermostats $1,504 $600
LE0584 #02 Y:2024 Reduce the pressure of compressed air to the minimum required $1,030 $100
LE0584 #01 Y:2024 Reschedule plant operations or reduce load to avoid peaks $1,871 -
UU0252 #04 Y:2024 Utilize higher efficiency lamps and/or ballasts $1,070 $4,410
UU0252 #03 Y:2024 Use solar heat to make electricty $1,880 $5,500
UU0252 #02 Y:2024 Use small number of high output units instead of many small inefficient units $53,389 $212,000
UU0252 #01 Y:2024 Use small number of high output units instead of many small inefficient units $19,754 $108,000
AM0703 #06 Y:2016 Eliminate or reduce compressed air usage $3,500 $195
AM0703 #05 Y:2016 Shift from daytime to nighttime operation $3,830 $1,000
AM0703 #04 Y:2016 Eliminate leaks in inert gas and compressed air lines/ valves $5,480 $445
AM0703 #03 Y:2016 Move product using mechanical means $23,300 $66,600
AM0703 #02 Y:2016 Make a practice of turning off lights when not needed $24,300 $11,400
AM0703 #01 Y:2016 Utilize higher efficiency lamps and/or ballasts $44,600 $52,500
UD0911 #10 Y:2014 Use decanting, flotation to remove contaminants $262,802 $80,000
UD0911 #09 Y:2014 Use photocell controls $732 $1,440