ITAC Assessment: AM0703
ITAC logo
ITAC Assessment: AM0703
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Fertilizer
NAICS 325314: Fertilizer (Mixing Only) Manufacturing
SIC 2875: Fertilizers, Mixing Only
Sales Range $100
M
to 500
M
# of Employees 125
Plant Area 197,000
ft2
Annual Production 300,000
ton
Production Hrs. Annual 8,736
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $320,548 5,326,845
kWh
Electricity Demand $53,235 10,898
kW-mo/yr
Electricity Fees $10,872 -
Natural Gas $26,847 3,908
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $105,010 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $60,410

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $44,600 $52,500 $38,800
680,500
kWh
$5,800
-
kW-mo/yr
02 2.7124: Make a practice of turning off lights when not needed $24,300 $11,400 $24,300
425,700
kWh
-
03 4.423: Move product using mechanical means $23,300 $66,600 $14,700
257,800
kWh
$8,600
-
kW-mo/yr
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,480 $445 $4,140
72,660
kWh
$1,340
-
kW-mo/yr
05 2.3134: Shift from daytime to nighttime operation $3,830 $1,000 - $3,830
-
kW-mo/yr
06 2.4239: Eliminate or reduce compressed air usage $3,500 $195 $3,500
61,700
kWh
-
TOTAL RECOMMENDED $105,010 $132,140 $85,440
1,498,360
kWh
$19,570
-
kW-mo/yr
TOTAL IMPLEMENTED $60,410 $79,640 $46,640
817,860
kWh
$13,770
-
kW-mo/yr
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs