ITAC Assessment: LE0584
ITAC logo
ITAC Assessment: LE0584
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Fertilizer (Mixing Only) Manufacturing
NAICS 325314: Fertilizer (Mixing Only) Manufacturing
SIC 2875: Fertilizers, Mixing Only
Sales Range $50
M
to 100
M
# of Employees 60
Plant Area 102,000
ft2
Annual Production 20,000,000
lb
Production Hrs. Annual 2,080
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $81,993 818,855
kWh
Electricity Demand $18,721 3,662
kW-mo/yr
Electricity Fees $4,195 -
Natural Gas $40,791 7,484
MMBtu
TOTAL YEARLY COSTS $145,700
RECOMMENDED SAVINGS* $173,526 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $1,871 - - $1,871
-
kW-mo/yr
- -
02 2.4231: Reduce the pressure of compressed air to the minimum required $1,030 $100 $796
7,968
kWh
$234
-
kW-mo/yr
- -
03 2.7261: Install timers and/or thermostats $1,504 $600 $1,504
15,039
kWh
- - -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,377 $2,400 $1,064
10,646
kWh
$313
-
kW-mo/yr
- -
05 4.651: Install back-up equipment $148,846 $350,000 - - - $148,846
06 2.1233: Analyze flue gas for proper air/fuel ratio $1,853 $5,000 - - $1,853
-
MMBtu
-
07 2.7425: Clean or color roof to reduce solar load $9,000 $31,500 $7,600
75,900
kWh
$3,400
-
kW-mo/yr
$(-2,000.0)
-
MMBtu
-
08 2.2442: Preheat combustion air with waste heat $8,045 $30,000 $(-1,117.0)
(-11,172)
kWh
$(-92.0)
-
kW-mo/yr
$9,254
-
MMBtu
-
TOTAL RECOMMENDED $173,526 $419,600 $9,847
98,381
kWh
$5,726
-
kW-mo/yr
$9,107
-
MMBtu
$148,846
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs