Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,144

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Resin and synthetic rubber manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
OR0534 #05 Y:2008 Reduce the pressure of compressed air to the minimum required $271 -
OR0534 #04 Y:2008 Optimize plant power factor $6,768 $6,825
OR0534 #03 Y:2008 Change procedures / equipment / operating conditions $6,794 -
OR0534 #02 Y:2008 Replace dc equipment with ac equipment $7,700 $167,953
OR0534 #01 Y:2008 Purchase new equipment to reduce material use / cost $47,698 $19,250
OR0532 #06 Y:2008 Turn off equipment when not in use $1,195 -
OR0532 #05 Y:2008 Optimize plant power factor $13,750 $20,650
OR0532 #04 Y:2008 Change procedures / equipment / operating conditions $27,532 $49,504
OR0532 #03 Y:2008 Install occupancy sensors $4,068 $13,244
OR0532 #02 Y:2008 Use adjustable frequency drive or multiple speed motors on existing system $4,101 $2,697
OR0532 #01 Y:2008 Recover heat from exhausted steam, hot air or hot water $4,033 $400
DL0017 #06 Y:2008 Replace electrically-operated equipment with fossil fuel equipment $4,572 $165,000
DL0017 #05 Y:2008 Utilize higher efficiency lamps and/or ballasts $9,006 $26,496
DL0017 #04 Y:2008 Install dry sprinkler system or other method to reduce heating requirements $6,100 $12,100
DL0017 #03 Y:2008 Eliminate or reduce compressed air usage $1,007 $800
DL0017 #02 Y:2008 Utilize energy-efficient belts and other improved mechanisms $738 -
DL0017 #01 Y:2008 Install compressor air intakes in coolest locations $1,841 -
UD0767 #08 Y:2007 Utilize higher efficiency lamps and/or ballasts $2,139 $5,050
UD0767 #07 Y:2007 Eliminate leaks in inert gas and compressed air lines/ valves $2,625 $2,175
UD0767 #06 Y:2007 Use cooling tower water instead of refrigeration $2,922 $5,000