ITAC Assessment: UD0767
ITAC logo
ITAC Assessment: UD0767
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product Polypropylene Compounding
NAICS 325211: Plastics Material and Resin Manufacturing
SIC 2821: Plastics Materials, Synthetic Resins, and Nonvulcanizable Elastomers
Sales Range $10
M
to 50
M
# of Employees 70
Plant Area 80,000
ft2
Annual Production 120,000,000
lb
Production Hrs. Annual 8,568
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,161,641 20,956,870
kWh
Natural Gas $30,587 2,395
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $86,305 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $32,909

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings
01 3.4156: Use flow control valves on equipment to optimize water use $30,284 $1,500 - - - $30,284
-
Tgal
-
02 2.4222: Install adequate dryers on air lines to eliminate blowdown $20,419 $17,235 $13,195
399,840
kWh
$7,224
-
kW-mo/yr
- - -
03 2.4224: Upgrade controls on compressors $14,876 - $9,613
291,312
kWh
$5,263
-
kW-mo/yr
- - -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $9,731 $33,190 $5,259
159,365
kWh
$2,468
-
kW-mo/yr
$2,004
-
MMBtu
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $3,309 $7,740 $2,275
68,928
kWh
$840
-
kW-mo/yr
- - $194
06 2.2612: Use cooling tower water instead of refrigeration $2,922 $5,000 $2,922
88,560
kWh
- - - -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,625 $2,175 $1,696
51,408
kWh
$929
-
kW-mo/yr
- - -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $2,139 $5,050 $1,278
38,727
kWh
$700
-
kW-mo/yr
- - $161
TOTAL RECOMMENDED $86,305 $71,890 $36,238
1,098,140
kWh
$17,424
-
kW-mo/yr
$2,004
-
MMBtu
$30,284
-
Tgal
$355
TOTAL IMPLEMENTED $32,909 $3,675 $1,696
51,408
kWh
$929
-
kW-mo/yr
- $30,284
-
Tgal
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs