| Assessment Year | 2016 |
|---|---|
| Principal Product | Fishing lures |
| NAICS | 339920: Sporting and Athletic Goods Manufacturing |
| SIC | 3949: Sporting and Athletic Goods, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 100 |
| Plant Area |
45,000
ft2
|
| Annual Production | 5,000,000
units
|
| Production Hrs. Annual | 2,688
hrs
|
| Location (State) | Arkansas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $96,766 | 1,927,680 |
kWh
|
$0.050 |
| Electricity Demand | $59,939 | 6,131 |
kW-mo/yr
|
$9.78 |
| Natural Gas | $24,705 | 2,554 |
MMBtu
|
$9.67 |
| TOTAL YEARLY COSTS | $181,410 | |||
| RECOMMENDED SAVINGS* | $13,176 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $6,229 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,199 | $1,105 |
$2,199
43,814
kWh
|
- | - | |
| 02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $269 | - |
$269
5,368
kWh
|
- | - | |
| 03 | 2.3212: Optimize plant power factor | $1,731 | $5,940 | - | - | $1,731 | |
| 04 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $1,707 | - | - |
$1,707
-
kW-mo/yr
|
- | |
| 05 | 2.8121: Apply for tax-free status for energy purchases | $3,509 | $100 | - | - | $3,509 | |
| 06 | 2.2612: Use cooling tower water instead of refrigeration | $3,761 | - |
$2,010
40,045
kWh
|
$1,751
-
kW-mo/yr
|
- | |
| TOTAL RECOMMENDED | $13,176 | $7,145 |
$4,478
89,227
kWh
|
$3,458
-
kW-mo/yr
|
$5,240 | ||
| TOTAL IMPLEMENTED | $6,229 | $1,105 |
$4,478
89,227
kWh
|
$1,751
-
kW-mo/yr
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs