ITAC Assessment: OK0939
ITAC logo
ITAC Assessment: OK0939
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Fishing lures
NAICS 339920: Sporting and Athletic Goods Manufacturing
SIC 3949: Sporting and Athletic Goods, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 45,000
ft2
Annual Production 5,000,000
units
Production Hrs. Annual 2,688
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $96,766 1,927,680
kWh
Electricity Demand $59,939 6,131
kW-mo/yr
Natural Gas $24,705 2,554
MMBtu
TOTAL YEARLY COSTS $181,410
RECOMMENDED SAVINGS* $13,176 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,229

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,199 $1,105 $2,199
43,814
kWh
- -
02 2.4231: Reduce the pressure of compressed air to the minimum required $269 - $269
5,368
kWh
- -
03 2.3212: Optimize plant power factor $1,731 $5,940 - - $1,731
04 2.3131: Reschedule plant operations or reduce load to avoid peaks $1,707 - - $1,707
-
kW-mo/yr
-
05 2.8121: Apply for tax-free status for energy purchases $3,509 $100 - - $3,509
06 2.2612: Use cooling tower water instead of refrigeration $3,761 - $2,010
40,045
kWh
$1,751
-
kW-mo/yr
-
TOTAL RECOMMENDED $13,176 $7,145 $4,478
89,227
kWh
$3,458
-
kW-mo/yr
$5,240
TOTAL IMPLEMENTED $6,229 $1,105 $4,478
89,227
kWh
$1,751
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs