Assessment Year | 2009 |
---|---|
Principal Product | Lumber |
NAICS | 321113: Sawmills |
SIC | 2421: Sawmills and Planing Mills, General |
Sales Range | $50 M to 100M |
# of Employees | 225 |
Plant Area |
100,000
ft2
|
Annual Production | 100,000,000
thousand feet
|
Production Hrs. Annual | 2,860
hrs
|
Location (State) | Alabama |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,036,013 | 14,305,830 |
kWh
|
$0.072 |
Wood | $1,212,750 | 841,000 |
MMBtu
|
$1.44 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $248,049 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $200,066 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Wood Savings |
---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $10,780 | $1,500 |
$10,780
148,794
kWh
|
- | |
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $8,120 | - |
$8,120
112,134
kWh
|
- | |
03 | 2.2437: Recover waste heat from equipment | $11,800 | $2,900 |
$11,800
99,455
kWh
|
- | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $10,882 | $87,077 |
$10,882
150,301
kWh
|
- | |
05 | 2.7134: Use photocell controls | $1,846 | $1,782 |
$1,846
25,500
kWh
|
- | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $899 | $5,448 |
$899
12,415
kWh
|
- | |
07 | 2.2136: Install / repair insulation on steam lines | $3,983 | $2,478 | - |
$3,983
-
MMBtu
|
|
08 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $129,337 | - |
$129,337
-
kWh
|
- | |
09 | 2.7261: Install timers and/or thermostats | $3,810 | $2,210 |
$3,810
52,626
kWh
|
- | |
10 | 2.2425: Use flue gases to heat process or service water | $40,375 | $77,000 | - |
$40,375
-
MMBtu
|
|
11 | 2.4224: Upgrade controls on compressors | $26,217 | $10,000 |
$26,217
362,016
kWh
|
- | |
TOTAL RECOMMENDED | $248,049 | $190,395 |
$203,691
963,241
kWh
|
$44,358
-
MMBtu
|
||
TOTAL IMPLEMENTED | $200,066 | $175,713 |
$155,708
364,136
kWh
|
$44,358
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Wood Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs