ITAC Assessment: OR0532
ITAC logo
ITAC Assessment: OR0532
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product Urea-Formaldehyde
NAICS 325211: Plastics Material and Resin Manufacturing
SIC 2821: Plastics Materials, Synthetic Resins, and Nonvulcanizable Elastomers
Sales Range $50
M
to 100
M
# of Employees 92
Plant Area 217,800
ft2
Annual Production 120,000,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $274,054 15,037,600
kWh
Electricity Demand $78,717 26,645
kW-mo/yr
Electricity Fees $784 -
Natural Gas $278,103 27,489
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $54,679 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.2449: Recover heat from exhausted steam, hot air or hot water $4,033 $400 $4,033
258
kWh
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $4,101 $2,697 $4,101
417
kWh
03 2.7135: Install occupancy sensors $4,068 $13,244 $4,068
333
kWh
04 3.1191: Change procedures / equipment / operating conditions $27,532 $49,504 $27,532
3
kWh
05 2.3212: Optimize plant power factor $13,750 $20,650 $13,750
-
kWh
06 2.6218: Turn off equipment when not in use $1,195 - $1,195
112
kWh
TOTAL RECOMMENDED $54,679 $86,495 $54,679
1,123
kWh
TOTAL IMPLEMENTED - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs