ITAC Assessment: DL0017
ITAC logo
ITAC Assessment: DL0017
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product Resins and associated chemicals, coatings and slit rolls
NAICS 325211: Plastics Material and Resin Manufacturing
SIC 2821: Plastics Materials, Synthetic Resins, and Nonvulcanizable Elastomers
Sales Range $10
M
to 50
M
# of Employees 99
Plant Area 20,000
ft2
Annual Production 6,000,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) Delaware

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $640,990 6,979,376
kWh
Electricity Demand $86,778 1,191
kW-mo/yr
Natural Gas $164,047 172,510
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $23,264 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,013

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4221: Install compressor air intakes in coolest locations $1,841 - $1,841
20,011
kWh
- -
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $738 - $665
7,223
kWh
$73
-
kW-mo/yr
-
03 2.4239: Eliminate or reduce compressed air usage $1,007 $800 $1,007
10,950
kWh
- -
04 2.7293: Install dry sprinkler system or other method to reduce heating requirements $6,100 $12,100 $2,500
30,000
kWh
$3,600
-
kW-mo/yr
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $9,006 $26,496 $9,006
87,439
kWh
- -
06 2.1311: Replace electrically-operated equipment with fossil fuel equipment $4,572 $165,000 - - $4,572
-
MMBtu
TOTAL RECOMMENDED $23,264 $204,396 $15,019
155,623
kWh
$3,673
-
kW-mo/yr
$4,572
-
MMBtu
TOTAL IMPLEMENTED $10,013 $27,296 $10,013
98,389
kWh
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs