ITAC Assessment: OR0534
ITAC logo
ITAC Assessment: OR0534
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product Custom Moulding
NAICS 325211: Plastics Material and Resin Manufacturing
SIC 2821: Plastics Materials, Synthetic Resins, and Nonvulcanizable Elastomers
Sales Range $1
M
to 5
M
# of Employees 15
Plant Area 3,000
ft2
Annual Production 100,000
thousand feet
Production Hrs. Annual 2,600
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $26,752 797,626
kWh
Electricity Demand $8,129 1,478
kW-mo/yr
Electricity Fees $5,184 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $73,056 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $15,499

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Personnel Changes Savings Primary Product Savings Increase in Production Savings
01 4.132: Purchase new equipment to reduce material use / cost $47,698 $19,250 $1,546
46,137
kWh
$152
-
kW-mo/yr
- $1,000 - $45,000
02 2.3311: Replace dc equipment with ac equipment $7,700 $167,953 $7,700
228,400
kWh
- - - - -
03 3.1191: Change procedures / equipment / operating conditions $6,794 - - - - - $6,794 -
04 2.3212: Optimize plant power factor $6,768 $6,825 - - $6,768 - - -
05 2.4231: Reduce the pressure of compressed air to the minimum required $271 - $271
5,772
kWh
- - - - -
06 2.4224: Upgrade controls on compressors $1,203 - $1,203
26,147
kWh
- - - - -
07 2.4221: Install compressor air intakes in coolest locations $127 $125 $127
2,158
kWh
- - - - -
08 2.7135: Install occupancy sensors $1,219 $2,510 $1,219
23,341
kWh
- - - - -
09 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $829 $2,700 $829
20,644
kWh
- - - - -
10 2.4133: Use most efficient type of electric motors $447 $808 $447
6,219
kWh
- - - - -
TOTAL RECOMMENDED $73,056 $200,171 $13,342
358,818
kWh
$152
-
kW-mo/yr
$6,768 $1,000 $6,794 $45,000
TOTAL IMPLEMENTED $15,499 $10,143 $1,937
35,332
kWh
- $6,768 - $6,794 -