ITAC Assessment: SU0202
ITAC logo
ITAC Assessment: SU0202
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Hardwood Lumber
NAICS 321113: Sawmills
SIC 2421: Sawmills and Planing Mills, General
Sales Range $10
M
to 50
M
# of Employees 80
Plant Area 37,000
ft2
Annual Production 10,000,000
thousand feet
Production Hrs. Annual 2,470
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $164,424 3,663,788
kWh
Electricity Demand $131,507 15,007
kW-mo/yr
Electricity Fees $7,125 -
Natural Gas $6,610 1,738
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $99,923 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,227

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Ancillary Material Cost Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $1,315 - $676
15,017
kWh
$639
-
kW-mo/yr
- - -
02 2.4221: Install compressor air intakes in coolest locations $1,691 $150 $868
19,291
kWh
$823
-
kW-mo/yr
- - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,644 $500 $847
18,821
kWh
$797
-
kW-mo/yr
- - -
04 2.4314: Use synthetic lubricant $1,315 $2,000 $676
15,028
kWh
$639
-
kW-mo/yr
- - -
05 2.6211: Conserve energy by efficient use of vending machines $482 $1,330 $377
8,387
kWh
$105
-
kW-mo/yr
- - -
06 2.3212: Optimize plant power factor $5,577 $30,560 - - $5,577 - -
07 2.3414: Burn waste to produce steam to drive a steam turbine generator set and use steam exhaust for heat $87,899 $535,000 $164,424
3,663,788
kWh
$131,461
-
kW-mo/yr
- $6,604
-
MMBtu
$(-214,590.0)
TOTAL RECOMMENDED $99,923 $569,540 $167,868
3,740,332
kWh
$134,464
-
kW-mo/yr
$5,577 $6,604
-
MMBtu
$(-214,590.0)
TOTAL IMPLEMENTED $10,227 $31,210 $2,391
53,129
kWh
$2,259
-
kW-mo/yr
$5,577 - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs