Assessment Year | 1995 |
---|---|
Principal Product | Aircraft Galleys |
NAICS |
n/a
|
SIC | 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 200 |
Plant Area |
74,060
ft2
|
Annual Production | 600
pieces
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $170,267 | 2,554,220 |
kWh
|
$0.067 |
Other Gas | $3,439 | 408 |
MMBtu
|
$8.43 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $25,212 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $16,204 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Other Liquid (haz) Savings | Solid Waste (non-haz) Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $9,049 | $2,639 |
$9,049
122,802
kWh
|
- | - | |
02 | 2.7135: Install occupancy sensors | $2,432 | $256 |
$2,432
37,808
kWh
|
- | - | |
03 | 2.4133: Use most efficient type of electric motors | $1,442 | $2,820 |
$1,442
21,981
kWh
|
- | - | |
04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $94 | $300 |
$94
1,758
kWh
|
- | - | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,847 | $350 |
$1,847
28,429
kWh
|
- | - | |
06 | 2.7492: Use proper thickness of insulation on building envelope | $3,128 | $5,933 |
$3,128
61,254
kWh
|
- | - | |
07 | 3.3125: Use distillation, evaporation to remove contaminants | $5,040 | $4,450 | - |
$5,040
-
gal
|
- | |
08 | 3.5311: Recover and reuse waste material | $2,180 | - | - | - |
$2,180
-
lb
|
|
TOTAL RECOMMENDED | $25,212 | $16,748 |
$17,992
274,032
kWh
|
$5,040
-
gal
|
$2,180
-
lb
|
||
TOTAL IMPLEMENTED | $16,204 | $8,922 |
$14,024
212,485
kWh
|
- |
$2,180
-
lb
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Other Liquid (haz) Savings | Solid Waste (non-haz) Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs