ITAC Assessment: CO0209
ITAC logo
ITAC Assessment: CO0209
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product BREAD AND ROLLS
NAICS
n/a
SIC 2051: Bread and Other Bakery Products, Except Cookies and Crackers
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area
n/a
Annual Production 25,000,000
lb
Production Hrs. Annual 5,200
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $129,401 2,584,408
kWh
Natural Gas $70,192 24,935
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $4,380 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,380

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4133: Use most efficient type of electric motors $760 $2,147 $760
15,240
kWh
-
02 2.4231: Reduce the pressure of compressed air to the minimum required $2,050 $1,000 $2,050
41,032
kWh
-
03 2.6212: Turn off equipment during breaks, reduce operating time $900 $1,500 - $900
-
MMBtu
04 2.7142: Utilize higher efficiency lamps and/or ballasts $670 $2,790 $670
13,482
kWh
-
TOTAL RECOMMENDED $4,380 $7,437 $3,480
69,754
kWh
$900
-
MMBtu
TOTAL IMPLEMENTED $4,380 $7,437 $3,480
69,754
kWh
$900
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs