ITAC Assessment: LL0225
ITAC logo
ITAC Assessment: LL0225
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Rice Milling
NAICS 311211: Flour Milling
SIC 2044: Rice Milling
Sales Range $10
M
to 50
M
# of Employees 55
Plant Area 112,000
ft2
Annual Production 2,250,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $40,852 760,474
kWh
Electricity Demand $29,815 4,253
kW-mo/yr
Electricity Fees $2,684 -
Natural Gas $50,775 5,252
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $181,636 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $177,100

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $16,146 $2,000 $12,436
231,490
kWh
$3,119
-
kW-mo/yr
$591 - - -
02 2.4231: Reduce the pressure of compressed air to the minimum required $3,111 $50 $2,997
55,789
kWh
- $114 - - -
03 2.4231: Reduce the pressure of compressed air to the minimum required $2,676 $400 $2,580
48,022
kWh
- $96 - - -
04 2.2511: Insulate bare equipment $1,991 - - - - $1,991
-
MMBtu
- -
05 2.7135: Install occupancy sensors $1,445 - $1,392
25,907
kWh
- $53 - - -
06 2.7134: Use photocell controls $1,100 - $1,060
19,727
kWh
- $40 - - -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $667 $150 - - - $667
-
MMBtu
- -
08 4.611: Begin a practice of predictive / preventative maintenance $154,500 $2,500 - - - - $152,000 $2,500
TOTAL RECOMMENDED $181,636 $5,100 $20,465
380,935
kWh
$3,119
-
kW-mo/yr
$894 $2,658
-
MMBtu
$152,000 $2,500
TOTAL IMPLEMENTED $177,100 $5,100 $18,013
335,301
kWh
$3,119
-
kW-mo/yr
$801 $667
-
MMBtu
$152,000 $2,500
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs