Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,250

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Resin, synthetic rubber, and artificial synthetic fibers and filaments manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UA0285 #02 Y:2024 Reduce the pressure of compressed air to the minimum required $682 $250
UA0285 #01 Y:2024 Use solar heat to make electricty $117,423 $1,498,840
OR0788 #06 Y:2024 Install / repair insulation on steam lines $2,489 $150,000
OR0788 #05 Y:2024 Insulate glazing, walls, ceilings, and roofs $3,766 $200,000
OR0788 #04 Y:2024 Reduce infiltration to refrigerated areas; isolate hot equipment from refrigerated areas $6,183 $30,000
OR0788 #03 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $7,448 $150,000
OR0788 #02 Y:2024 Replace hydraulic / pneumatic equipment with electric equipment $25,469 $250,000
OR0788 #01 Y:2024 Install smaller boiler (increase high fire duty cycle) $126,866 $2,500,000
UF0609 #07 Y:2024 Level zero – install control systems for existing equipment $21,071 $25,000
UF0609 #06 Y:2024 Level one – add communication using iiot devices to existing control system to modify operations $35,940 -
UF0609 #05 Y:2024 Optimize plant power factor $3,546 $9,000
UF0609 #04 Y:2024 Install soft-start to eliminate nuisance trips $14,767 $40,488
UF0609 #03 Y:2024 Utilize controls to operate equipment only when needed $16,360 $25,380
UF0609 #02 Y:2024 Use demand controller or load shedder $38,174 $25,504
UF0609 #01 Y:2024 Use solar heat to make electricty $104,116 $322,608
GT0971 #06 Y:2023 Use solar heat to make electricty $137,329 $2,565,299
GT0971 #05 Y:2023 Optimize plant power factor $1,025 $5,227
GT0971 #04 Y:2023 Use adjustable frequency drive or multiple speed motors on existing system $13,705 $17,982
GT0971 #03 Y:2023 Turn off equipment when not in use $4,632 $867
GT0971 #02 Y:2023 Chill water to the highest temperature possible $3,384 $400