1,259
matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| UL2405 #05 Y:2024 | 05 | 2024 | Use adjustable frequency drive or multiple speed motors on existing system | $2,190 | $4,575 | |
| UL2405 #04 Y:2024 | 04 | 2024 | Install occupancy sensors | $1,107 | $3,037 | |
| UL2405 #03 Y:2024 | 03 | 2024 | Utilize higher efficiency lamps and/or ballasts | $9,858 | $3,659 | |
| UL2405 #02 Y:2024 | 02 | 2024 | Use solar heat to make electricty | $25,806 | $233,239 | |
| UL2405 #01 Y:2024 | 01 | 2024 | Optimize plant power factor | $15,621 | $11,018 | |
| UA0285 #06 Y:2024 | 06 | 2024 | Optimize plant power factor | $20,619 | $5,049 | |
| UA0285 #05 Y:2024 | 05 | 2024 | Utilize energy-efficient belts and other improved mechanisms | $757 | $411 | |
| UA0285 #04 Y:2024 | 04 | 2024 | Install occupancy sensors | $159 | $301 | |
| UA0285 #03 Y:2024 | 03 | 2024 | Install timers and/or thermostats | $461 | $116 | |
| UA0285 #02 Y:2024 | 02 | 2024 | Reduce the pressure of compressed air to the minimum required | $682 | $250 | |
| UA0285 #01 Y:2024 | 01 | 2024 | Use solar heat to make electricty | $117,423 | $1,498,840 | |
| OR0788 #06 Y:2024 | 06 | 2024 | Install / repair insulation on steam lines | $2,489 | $150,000 | |
| OR0788 #05 Y:2024 | 05 | 2024 | Insulate glazing, walls, ceilings, and roofs | $3,766 | $200,000 | |
| OR0788 #04 Y:2024 | 04 | 2024 | Reduce infiltration to refrigerated areas; isolate hot equipment from refrigerated areas | $6,183 | $30,000 | |
| OR0788 #03 Y:2024 | 03 | 2024 | Use adjustable frequency drive or multiple speed motors on existing system | $7,448 | $150,000 | |
| OR0788 #02 Y:2024 | 02 | 2024 | Replace hydraulic / pneumatic equipment with electric equipment | $25,469 | $250,000 | |
| OR0788 #01 Y:2024 | 01 | 2024 | Install smaller boiler (increase high fire duty cycle) | $126,866 | $2,500,000 | |
| UF0609 #07 Y:2024 | 07 | 2024 | Level zero – install control systems for existing equipment | $21,071 | $25,000 | |
| UF0609 #06 Y:2024 | 06 | 2024 | Level one – add communication using iiot devices to existing control system to modify operations | $35,940 | - | |
| UF0609 #05 Y:2024 | 05 | 2024 | Optimize plant power factor | $3,546 | $9,000 |