ITAC Assessment: OR0788
ITAC logo
ITAC Assessment: OR0788
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Phenolic Resins
NAICS 325211: Plastics Material and Resin Manufacturing
SIC 2821: Plastics Materials, Synthetic Resins, and Nonvulcanizable Elastomers
Sales Range $50
M
to 100
M
# of Employees 30
Plant Area 210,000
ft2
Annual Production 154,000,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $215,791 5,101,440
kWh
Electricity Demand $83,959 9,718
kW-mo/yr
Electricity Fees $(-5,476.0) -
Natural Gas $578,760 78,528
MMBtu
Waste Disposal Costs
Water Usage $53,898 13,165
Tgal
TOTAL YEARLY COSTS $926,932
RECOMMENDED SAVINGS* $172,221 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $126,866

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.1223: Install smaller boiler (increase high fire duty cycle) $126,866 $2,500,000 - $126,866
-
MMBtu
- -
02 2.4324: Replace hydraulic / pneumatic equipment with electric equipment $25,469 $250,000 $1,431
33,826
kWh
- $10,000 $14,038
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $7,448 $150,000 $7,448
176,076
kWh
- - -
04 2.2523: Reduce infiltration to refrigerated areas; isolate hot equipment from refrigerated areas $6,183 $30,000 $(-1,926.0)
(-45,525)
kWh
$8,109
-
MMBtu
- -
05 2.7491: Insulate glazing, walls, ceilings, and roofs $3,766 $200,000 - $3,766
-
MMBtu
- -
06 2.2136: Install / repair insulation on steam lines $2,489 $150,000 $2,489
57,611
kWh
- - -
TOTAL RECOMMENDED $172,221 $3,280,000 $9,442
221,988
kWh
$138,741
-
MMBtu
$10,000 $14,038
TOTAL IMPLEMENTED $126,866 $2,500,000 - $126,866
-
MMBtu
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs