Assessment Year | 2024 |
---|---|
Principal Product | Phenolic Resins |
NAICS | 325211: Plastics Material and Resin Manufacturing |
SIC | 2821: Plastics Materials, Synthetic Resins, and Nonvulcanizable Elastomers |
Sales Range | $50 M to 100M |
# of Employees | 30 |
Plant Area |
210,000
ft2
|
Annual Production | 154,000,000
lb
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Oregon |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $215,791 | 5,101,440 |
kWh
|
$0.042 | |
Electricity Demand | $83,959 | 9,718 |
kW-mo/yr
|
$8.64 | |
Electricity Fees | $(-5,476.0) | - |
|
- | |
Natural Gas | $578,760 | 78,528 |
MMBtu
|
$7.37 | |
Waste Disposal Costs | |||||
Water Usage | $53,898 | 13,165 |
Tgal
|
$4.09 | |
TOTAL YEARLY COSTS | $926,932 | ||||
RECOMMENDED SAVINGS* | $172,221 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $126,866 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.1223: Install smaller boiler (increase high fire duty cycle) | $126,866 | $2,500,000 | - |
$126,866
-
MMBtu
|
- | - | |
02 | 2.4324: Replace hydraulic / pneumatic equipment with electric equipment | $25,469 | $250,000 |
$1,431
33,826
kWh
|
- | $10,000 | $14,038 | |
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $7,448 | $150,000 |
$7,448
176,076
kWh
|
- | - | - | |
04 | 2.2523: Reduce infiltration to refrigerated areas; isolate hot equipment from refrigerated areas | $6,183 | $30,000 |
$(-1,926.0)
(-45,525)
kWh
|
$8,109
-
MMBtu
|
- | - | |
05 | 2.7491: Insulate glazing, walls, ceilings, and roofs | $3,766 | $200,000 | - |
$3,766
-
MMBtu
|
- | - | |
06 | 2.2136: Install / repair insulation on steam lines | $2,489 | $150,000 |
$2,489
57,611
kWh
|
- | - | - | |
TOTAL RECOMMENDED | $172,221 | $3,280,000 |
$9,442
221,988
kWh
|
$138,741
-
MMBtu
|
$10,000 | $14,038 | ||
TOTAL IMPLEMENTED | $126,866 | $2,500,000 | - |
$126,866
-
MMBtu
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs