| Assessment Year | 2024 |
|---|---|
| Principal Product | Resins |
| NAICS | 325211: Plastics Material and Resin Manufacturing |
| SIC | 2821: Plastics Materials, Synthetic Resins, and Nonvulcanizable Elastomers |
| Sales Range | $50 M to 100M |
| # of Employees | 50 |
| Plant Area |
115,600
ft2
|
| Annual Production | 15
ton
|
| Production Hrs. Annual | 8,736
hrs
|
| Location (State) | Kentucky |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $102,647 | 3,106,320 |
kWh
|
$0.033 | |
| Electricity Demand | $137,772 | 5,721 |
kW-mo/yr
|
$24.08 | |
| Electricity Fees | $32,279 | - |
|
- | |
| Natural Gas | $429,584 | 73,229 |
MMBtu
|
$5.87 | |
| Waste Disposal Costs | |||||
| Water Usage | $158,265 | 7,257 |
Tgal
|
$21.81 | |
| TOTAL YEARLY COSTS | $860,547 | ||||
| RECOMMENDED SAVINGS* | $234,890 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | - | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Water Usage Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.3212: Optimize plant power factor | $15,621 | $11,018 | - | - | $15,621 | - | - | |
| 02 | 2.9114: Use solar heat to make electricty | $25,806 | $233,239 |
$11,232
339,900
kWh
|
$14,574
-
kW-mo/yr
|
- | - | - | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $9,858 | $3,659 |
$4,469
135,413
kWh
|
$5,389
-
kW-mo/yr
|
- | - | - | |
| 04 | 2.7135: Install occupancy sensors | $1,107 | $3,037 |
$1,107
33,546
kWh
|
- | - | - | - | |
| 05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $2,190 | $4,575 |
$2,190
66,370
kWh
|
- | - | - | - | |
| 06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $699 | - |
$699
21,172
kWh
|
- | - | - | - | |
| 07 | 2.2121: Increase amount of condensate returned | $139,372 | $168,400 | - | - | - |
$33,041
-
MMBtu
|
$106,331
-
Tgal
|
|
| 08 | 2.6212: Turn off equipment during breaks, reduce operating time | $5,710 | - |
$559
16,941
kWh
|
- | - |
$5,151
-
MMBtu
|
- | |
| 09 | 2.2437: Recover waste heat from equipment | $11,682 | $13,000 | - | - | - |
$11,682
-
MMBtu
|
- | |
| 10 | 2.2437: Recover waste heat from equipment | $22,845 | $13,000 | - | - | - |
$22,845
-
MMBtu
|
- | |
| TOTAL RECOMMENDED | $234,890 | $449,928 |
$20,256
613,342
kWh
|
$19,963
-
kW-mo/yr
|
$15,621 |
$72,719
-
MMBtu
|
$106,331
-
Tgal
|
||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Water Usage Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs