Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,241

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Resin, synthetic rubber, and artificial synthetic fibers and filaments manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UL2407 #07 Y:2024 Improve air circulation with destratification fans / other methods $4,307 $10,000
UL2407 #06 Y:2024 Reduce the pressure of compressed air to the minimum required $3,343 -
UL2407 #05 Y:2024 Use outside cold water source as a supply of cooling water $41,469 $69,175
UL2407 #04 Y:2024 Use solar heat to make electricty $77,264 $788,082
UL2407 #03 Y:2024 Install occupancy sensors $184 $342
UL2407 #02 Y:2024 Utilize higher efficiency lamps and/or ballasts $18,908 $5,457
UL2407 #01 Y:2024 Optimize plant power factor $34,496 $23,699
WV0664 #10 Y:2024 Insulate bare equipment $121 $293
WV0664 #09 Y:2024 Eliminate or reduce compressed air usage $382 $328
WV0664 #08 Y:2024 Reduce the pressure of compressed air to the minimum required $391 $222
WV0664 #07 Y:2024 Develop a repair/replace policy $535 $1,139
WV0664 #06 Y:2024 Establish a predictive maintenance program $792 $1,500
WV0664 #05 Y:2024 Utilize energy-efficient belts and other improved mechanisms $911 $1,030
WV0664 #04 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $2,469 $12,134
WV0664 #03 Y:2024 Upgrade controls on compressors $2,777 $3,541
WV0664 #02 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $3,056 $426
WV0664 #01 Y:2024 Analyze flue gas for proper air/fuel ratio $3,899 $1,019
UL2405 #10 Y:2024 Recover waste heat from equipment $22,845 $13,000
UL2405 #09 Y:2024 Recover waste heat from equipment $11,682 $13,000
UL2405 #08 Y:2024 Turn off equipment during breaks, reduce operating time $5,710 -