ITAC Assessment: LS2417
ITAC logo
ITAC Assessment: LS2417
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product EPDM Rubber
NAICS 325212: Synthetic Rubber Manufacturing
SIC 2822: Synthetic Rubber (Vulcanizable Elastomers)
Sales Range $50
M
to 100
M
# of Employees 180
Plant Area 1,836,350
ft2
Annual Production 250,000,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $5,418,519 112,100,345
kWh
Electricity Demand $1,426,100 184,709
kW-mo/yr
LPG $117,605 5,493
MMBtu
TOTAL YEARLY COSTS $6,962,224
RECOMMENDED SAVINGS* $373,879 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings LPG Savings Administrative Changes Savings
01 2.7121: Utilize daylight whenever possible in lieu of artificial light $1,135 $75 $1,135
23,652
kWh
- - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,173 $90 $1,173
24,431
kWh
- - -
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $82,069 $99,800 $82,069
1,709,776
kWh
- - -
04 2.1321: Replace fossil fuel equipment with electrical equipment $182,554 $481,830 - - $102,554
-
MMBtu
$80,000
05 2.4224: Upgrade controls on compressors $9,379 $28,000 $9,379
195,398
kWh
- - -
06 2.4133: Use most efficient type of electric motors $33,694 $120,300 $33,694
701,965
kWh
- - -
07 2.9114: Use solar heat to make electricty $63,875 $514,800 $21,603
450,068
kWh
$42,272
-
kW-mo/yr
- -
TOTAL RECOMMENDED $373,879 $1,244,895 $149,053
3,105,290
kWh
$42,272
-
kW-mo/yr
$102,554
-
MMBtu
$80,000
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings LPG Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs