ITAC Assessment: DS0078
ITAC logo
ITAC Assessment: DS0078
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Plastic Bags
NAICS
n/a
SIC 2673: Plastics, Foil, and Coated Paper Bags
Sales Range $10
M
to 50
M
# of Employees 295
Plant Area 232,110
ft2
Annual Production 79,000,000
lb
Production Hrs. Annual 8,736
hrs
Location (State) South Dakota

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $719,178 24,518,758
kWh
Electricity Demand $267,283 38,196
kW-mo/yr
Electricity Fees $59,511 -
Natural Gas $62,003 14,863
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $822,407 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,148

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.4133: Use most efficient type of electric motors $3,806 $28,425 $2,593
88,511
kWh
$1,213
-
kW-mo/yr
- - - -
02 2.4221: Install compressor air intakes in coolest locations $4,342 $750 $4,342
148,300
kWh
- - - - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $9,866 $17,925 $7,338
250,586
kWh
$2,528
-
kW-mo/yr
- - - -
04 2.2511: Insulate bare equipment $14,716 $19,230 $13,456
459,261
kWh
$1,260
-
kW-mo/yr
- - - -
05 3.5316: Contract a wood pallet recycling company $1,360 $100 - - - - $1,360 -
06 3.2176: Increase use of automation $752,148 $810,000 $(-24,732.0)
(-575,029)
kWh
- - $776,880 - -
07 3.5311: Recover and reuse waste material $36,169 - - - $576
-
lb
$(-2,800.0) - $38,393
TOTAL RECOMMENDED $822,407 $876,430 $2,997
371,629
kWh
$5,001
-
kW-mo/yr
$576
-
lb
$774,080 $1,360 $38,393
TOTAL IMPLEMENTED $8,148 $29,175 $6,935
236,811
kWh
$1,213
-
kW-mo/yr
- - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs