Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,259

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Resin, synthetic rubber, and artificial synthetic fibers and filaments manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
KS2438 #07 Y:2024 Replace boiler $50,929 $423,280
KS2438 #06 Y:2024 Use waste heat from hot flue gases to preheat $33,307 $75,751
KS2438 #05 Y:2024 Install / repair insulation on steam lines $2,618 $1,634
KS2438 #04 Y:2024 Repair and eliminate steam leaks $11,840 $2,305
KS2438 #03 Y:2024 Optimize plant power factor $37,880 $29,000
KS2438 #02 Y:2024 Use most efficient type of electric motors $21,757 $126,440
KS2438 #01 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $11,274 $29,920
LS2505 #05 Y:2024 Use solar heat to make electricty $22,808 $187,200
LS2505 #04 Y:2024 Upgrade controls on compressors $2,963 $12,500
LS2505 #03 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $9,223 $5,320
LS2505 #02 Y:2024 Utilize higher efficiency lamps and/or ballasts $50,919 $11,944
LS2505 #01 Y:2024 Regrind, reuse, or sell scrap plastic parts $22,320 -
LT8418 #05 Y:2024 Use solar heat to make electricty $40,288 $104,233
LT8418 #04 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $12,083 $8,430
LT8418 #03 Y:2024 Insulate bare equipment $1,816 $2,450
LT8418 #02 Y:2024 Replace fossil fuel equipment with electrical equipment $3,034 $35,000
LT8418 #01 Y:2024 Reduce the pressure of compressed air to the minimum required $2,113 -
DL0248 #07 Y:2024 Utilize higher efficiency lamps and/or ballasts $771 $736
DL0248 #06 Y:2024 Utilize higher efficiency lamps and/or ballasts $7,995 $4,980
DL0248 #05 Y:2024 Use optimum temperature $1,534 $550