ITAC Assessment: LS2505
ITAC logo
ITAC Assessment: LS2505
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product polypropylene
NAICS 325211: Plastics Material and Resin Manufacturing
SIC 2821: Plastics Materials, Synthetic Resins, and Nonvulcanizable Elastomers
Sales Range $50
M
to 100
M
# of Employees 156
Plant Area 545,272
ft2
Annual Production 1,200,000,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $6,775,571 132,189,000
kWh
Waste Disposal Costs
Solid Waste (non-haz) $4,320 180,000
lb
TOTAL YEARLY COSTS $6,779,891
RECOMMENDED SAVINGS* $108,233 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Solid Waste (non-haz) Savings One-time Revenue or Avoided Cost Savings
01 3.5212: Regrind, reuse, or sell scrap plastic parts $22,320 - - $4,320
-
lb
$18,000
02 2.7142: Utilize higher efficiency lamps and/or ballasts $50,919 $11,944 $50,919
998,412
kWh
- -
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $9,223 $5,320 $9,223
180,842
kWh
- -
04 2.4224: Upgrade controls on compressors $2,963 $12,500 $2,963
57,088
kWh
- -
05 2.9114: Use solar heat to make electricty $22,808 $187,200 $22,808
447,207
kWh
- -
TOTAL RECOMMENDED $108,233 $216,964 $85,913
1,683,549
kWh
$4,320
-
lb
$18,000
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs