ITAC Assessment: LT8418
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Plastic
NAICS 325211: Plastics Material and Resin Manufacturing
SIC 2821: Plastics Materials, Synthetic Resins, and Nonvulcanizable Elastomers
Sales Range $1
M
to 5
M
# of Employees 10
Plant Area 76,754
ft2
Annual Production 5,000,000
pieces
Production Hrs. Annual 8,760
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $101,910 1,968,778
kWh
Electricity Demand $100,607 6,980
kW-mo/yr
Electricity Fees $23,178 -
LPG $8,834 359
MMBtu
TOTAL YEARLY COSTS $234,529
RECOMMENDED SAVINGS* $59,334 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings LPG Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $2,113 - $1,524
29,824
kWh
$589
-
kW-mo/yr
-
02 2.1321: Replace fossil fuel equipment with electrical equipment $3,034 $35,000 $(-2,268.0)
(-43,800)
kWh
$(-2,593.0)
-
kW-mo/yr
$7,895
-
MMBtu
03 2.2511: Insulate bare equipment $1,816 $2,450 $1,315
25,395
kWh
$501
-
kW-mo/yr
-
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $12,083 $8,430 $8,748
168,892
kWh
$3,335
-
kW-mo/yr
-
05 2.9114: Use solar heat to make electricty $40,288 $104,233 $40,288
777,756
kWh
- -
TOTAL RECOMMENDED $59,334 $150,113 $49,607
958,067
kWh
$1,832
-
kW-mo/yr
$7,895
-
MMBtu
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs