Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,250

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Resin, synthetic rubber, and artificial synthetic fibers and filaments manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
OR0772 #01 Y:2023 Use adjustable frequency drive or multiple speed motors on existing system $22,304 $25,167
UD1063 #07 Y:2023 Optimize plant power factor $3,994 $10,500
UD1063 #06 Y:2023 Install occupancy sensors $170 $200
UD1063 #05 Y:2023 Utilize higher efficiency lamps and/or ballasts $1,201 $2,583
UD1063 #04 Y:2023 Install motor voltage controller on lightly loaded motors $4,227 $2,191
UD1063 #03 Y:2023 Eliminate leaks in inert gas and compressed air lines/ valves $461 $952
UD1063 #02 Y:2023 Reduce the pressure of compressed air to the minimum required $760 -
UD1063 #01 Y:2023 Eliminate or reduce compressed air usage $1,244 $297
UD1062 #06 Y:2023 Install occupancy sensors $1,152 $2,000
UD1062 #05 Y:2023 Install compressor air intakes in coolest locations $342 -
UD1062 #04 Y:2023 Eliminate leaks in inert gas and compressed air lines/ valves $727 $952
UD1062 #03 Y:2023 Meter recycled water (to reduce sewer charges) $705 $260
UD1062 #02 Y:2023 Reschedule plant operations or reduce load to avoid peaks $1,486 -
UD1062 #01 Y:2023 Turn off equipment during breaks, reduce operating time $5,907 -
WV0650 #10 Y:2023 Eliminate or reduce compressed air usage $136 $388
WV0650 #09 Y:2023 Utilize controls to operate equipment only when needed $1,956 $2,040
WV0650 #08 Y:2023 Develop a repair/replace policy $4,052 $8,935
WV0650 #07 Y:2023 Establish a predictive maintenance program $7,598 $1,500
WV0650 #06 Y:2023 Use or replace with energy efficient substitutes $8,134 $21,176
WV0650 #05 Y:2023 Eliminate leaks in inert gas and compressed air lines/ valves $8,595 $891