ITAC Assessment: OR0772
ITAC logo
ITAC Assessment: OR0772
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Formaldehyde Resins
NAICS 325211: Plastics Material and Resin Manufacturing
SIC 2821: Plastics Materials, Synthetic Resins, and Nonvulcanizable Elastomers
Sales Range $50
M
to 100
M
# of Employees 27
Plant Area 300,000
ft2
Annual Production 78,736
ton
Production Hrs. Annual 8,760
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $480,614 9,684,680
kWh
Electricity Demand $107,841 18,124
kW-mo/yr
Electricity Fees $22,047 -
Natural Gas $455,134 46,380
MMBtu
Waste Disposal Costs
Water Usage $68,573 20,880
Tgal
TOTAL YEARLY COSTS $1,134,209
RECOMMENDED SAVINGS* $48,034 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,566

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $22,304 $25,167 $19,906
373,256
kWh
$2,398
-
kW-mo/yr
- - -
02 2.4131: Size electric motors for peak operating efficiency $9,363 $1,352 $8,354
156,645
kWh
$1,009
-
kW-mo/yr
- - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $7,514 $8,385 $4,077
76,552
kWh
$997
-
kW-mo/yr
- $823 $1,617
04 2.3212: Optimize plant power factor $5,801 $7,178 - - $5,801 - -
05 2.7135: Install occupancy sensors $1,740 $3,039 $1,740
32,630
kWh
- - - -
06 2.2511: Insulate bare equipment $1,312 $5,390 $72
1,359
kWh
- - $1,240 -
TOTAL RECOMMENDED $48,034 $50,511 $34,149
640,442
kWh
$4,404
-
kW-mo/yr
$5,801 $2,063 $1,617
TOTAL IMPLEMENTED $10,566 $16,814 $5,889
110,541
kWh
$997
-
kW-mo/yr
- $2,063 $1,617
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs