ITAC Assessment: ME0167
ITAC logo
ITAC Assessment: ME0167
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product metal fabrications
NAICS
n/a
SIC 3541: Machine Tools, Metal Cutting Types
Sales Range $5
M
to 10
M
# of Employees 35
Plant Area 55,000
ft2
Annual Production 50
pieces
Production Hrs. Annual 4,000
hrs
Location (State) Maine

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $60,418 564,185
kWh
Natural Gas $11,086 1,734
MMBtu
LPG $904 45
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $6,256 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,565

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Administrative Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,675 $600 $2,675
38,101
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $2,434 $5,405 $2,434
33,411
kWh
-
03 2.8123: Pay utility bills on time $890 - - $890
04 2.7135: Install occupancy sensors $257 $600 $257
3,517
kWh
-
TOTAL RECOMMENDED $6,256 $6,605 $5,366
75,029
kWh
$890
TOTAL IMPLEMENTED $3,565 $600 $2,675
38,101
kWh
$890
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs