ITAC Assessment: CC0013
ITAC logo
ITAC Assessment: CC0013
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Printed Labels
NAICS 323111: Commercial Printing (except Screen and Books)
SIC 2759: Commercial Printing, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 55
Plant Area 21,500
ft2
Annual Production 1,500,000
thousand feet
Production Hrs. Annual 7,488
hrs
Location (State) South Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $145,518 2,730,799
kWh
Electricity Demand $142,210 7,202
kW-mo/yr
Electricity Fees $3,893 -
Natural Gas $745 51
MMBtu
Waste Disposal Costs
Water Usage $1,448 308,624
Tgal
Water Disposal $3,277 308,624
Tgal
TOTAL YEARLY COSTS $297,090
RECOMMENDED SAVINGS* $63,721 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Usage Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $2,074 - $1,373
25,930
kWh
$701
-
kW-mo/yr
-
02 2.6218: Turn off equipment when not in use $1,363 - $1,363
25,755
kWh
- -
03 2.3111: Heat water during off-peak periods and store for later use $4,697 $8,400 $629
11,875
kWh
$4,068
-
kW-mo/yr
-
04 2.2612: Use cooling tower water instead of refrigeration $21,990 $40,000 $15,408
291,045
kWh
$7,582
-
kW-mo/yr
$(-1,000.0)
-
Tgal
05 2.4239: Eliminate or reduce compressed air usage $33,597 $180,600 $19,380
366,080
kWh
$14,217
-
kW-mo/yr
-
TOTAL RECOMMENDED $63,721 $229,000 $38,153
720,685
kWh
$26,568
-
kW-mo/yr
$(-1,000.0)
-
Tgal
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs