Assessment Year | 2023 |
---|---|
Principal Product | Printed Labels |
NAICS | 323111: Commercial Printing (except Screen and Books) |
SIC | 2759: Commercial Printing, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 55 |
Plant Area |
21,500
ft2
|
Annual Production | 1,500,000
thousand feet
|
Production Hrs. Annual | 7,488
hrs
|
Location (State) | South Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $145,518 | 2,730,799 |
kWh
|
$0.053 | |
Electricity Demand | $142,210 | 7,202 |
kW-mo/yr
|
$19.75 | |
Electricity Fees | $3,893 | - |
|
- | |
Natural Gas | $745 | 51 |
MMBtu
|
$14.69 | |
Waste Disposal Costs | |||||
Water Usage | $1,448 | 308,624 |
Tgal
|
$0.005 | |
Water Disposal | $3,277 | 308,624 |
Tgal
|
$0.011 | |
TOTAL YEARLY COSTS | $297,090 | ||||
RECOMMENDED SAVINGS* | $63,721 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Water Usage Savings |
---|---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,074 | - |
$1,373
25,930
kWh
|
$701
-
kW-mo/yr
|
- | |
02 | 2.6218: Turn off equipment when not in use | $1,363 | - |
$1,363
25,755
kWh
|
- | - | |
03 | 2.3111: Heat water during off-peak periods and store for later use | $4,697 | $8,400 |
$629
11,875
kWh
|
$4,068
-
kW-mo/yr
|
- | |
04 | 2.2612: Use cooling tower water instead of refrigeration | $21,990 | $40,000 |
$15,408
291,045
kWh
|
$7,582
-
kW-mo/yr
|
$(-1,000.0)
-
Tgal
|
|
05 | 2.4239: Eliminate or reduce compressed air usage | $33,597 | $180,600 |
$19,380
366,080
kWh
|
$14,217
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $63,721 | $229,000 |
$38,153
720,685
kWh
|
$26,568
-
kW-mo/yr
|
$(-1,000.0)
-
Tgal
|
||
TOTAL IMPLEMENTED | - | - | - | - | - |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs