ITAC Assessment: OD0082
ITAC logo
ITAC Assessment: OD0082
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Soft drinks
NAICS
n/a
SIC 2086: Bottled and Canned Soft Drinks and Carbonated Waters
Sales Range $10
M
to 50
M
# of Employees 199
Plant Area 60,000
ft2
Annual Production 18,000
Tgal
Production Hrs. Annual 2,500
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $41,553 1,099,062
kWh
Electricity Demand $28,054 5,638
kW-mo/yr
Electricity Fees $33,202 -
Natural Gas $20,152 2,921
MMBtu
LPG $12,149 1,363
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $57,506 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,553 $989 $1,553
41,032
kWh
- -
02 2.4314: Use synthetic lubricant $503 $520 $503
8,206
kWh
- -
03 2.4133: Use most efficient type of electric motors $2,150 $10,066 $1,254
33,118
kWh
$896
-
kW-mo/yr
-
04 3.6124: Burn waste oil for heat $3,300 $5,320 $1,208
31,946
kWh
$2,092
-
kW-mo/yr
-
05 4.521: Clear and rent existing space $50,000 $1,600 - - $50,000
TOTAL RECOMMENDED $57,506 $18,495 $4,518
114,302
kWh
$2,988
-
kW-mo/yr
$50,000
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs