ITAC Assessment: WI0518
ITAC logo
ITAC Assessment: WI0518
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product printing books
NAICS
n/a
SIC 2752: Commercial Printing, Lithographic
Sales Range $10
M
to 50
M
# of Employees 327
Plant Area 240,000
ft2
Annual Production 40,000,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $291,291 79,608,000
kWh
Electricity Demand $186,487 22,520
kW-mo/yr
Natural Gas $109,048 9,937
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $79,321 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $50,211

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 4.424: Improve space comfort conditioning $39,412 $4,975 - - - $39,412
02 2.2414: Use waste heat from hot flue gases to preheat $14,585 $11,000 - - $14,585
-
MMBtu
-
03 2.3131: Reschedule plant operations or reduce load to avoid peaks $5,873 - - $5,873
-
kW-mo/yr
- -
04 2.6232: Install set-back timers $4,978 $1,400 - $4,978
-
kW-mo/yr
- -
05 2.2622: Replace existing chiller with high efficiency model $4,862 $7,000 $4,862
126,612
kWh
- - -
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,802 $1,630 $2,330
60,674
kWh
$1,472
-
kW-mo/yr
- -
07 2.4221: Install compressor air intakes in coolest locations $1,994 $2,560 $1,214
31,625
kWh
$780
-
kW-mo/yr
- -
08 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,722 - $1,160
30,213
kWh
$562
-
kW-mo/yr
- -
09 2.7142: Utilize higher efficiency lamps and/or ballasts $1,210 $778 $833
21,708
kWh
$377
-
kW-mo/yr
- -
10 2.6127: Maintain air filters by cleaning or replacement $883 - $883
28,199
kWh
- - -
TOTAL RECOMMENDED $79,321 $29,343 $11,282
299,031
kWh
$14,042
-
kW-mo/yr
$14,585
-
MMBtu
$39,412
TOTAL IMPLEMENTED $50,211 $8,313 $3,207
83,546
kWh
$7,592
-
kW-mo/yr
- $39,412
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings