Assessment Year | 2002 |
---|---|
Principal Product | Fiberglass boats |
NAICS |
n/a
|
SIC | 3732: Boat Building and Repairing |
Sales Range | $50 M to 100M |
# of Employees | 150 |
Plant Area |
80,000
ft2
|
Annual Production | 2,496
pieces
|
Production Hrs. Annual | 4,160
hrs
|
Location (State) | Maryland |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $91,492 | 2,516,828 |
kWh
|
$0.036 |
Electricity Fees | $40,549 | - |
|
- |
Natural Gas | $60,378 | 8,999 |
MMBtu
|
$6.71 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $73,208 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $57,865 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Water Disposal Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,414 | - |
$1,414
26,955
kWh
|
- | - | - | - | - | |
02 | 2.4239: Eliminate or reduce compressed air usage | $8,346 | $1,200 |
$8,346
159,170
kWh
|
- | - | - | - | - | |
03 | 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary | $1,869 | $235 |
$2,151
41,020
kWh
|
- | - | - | $(-282.0) | - | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $681 | $235 |
$681
12,972
kWh
|
- | - | - | - | - | |
05 | 2.7111: Reduce illumination to minimum necessary levels | $4,995 | $235 |
$4,995
95,181
kWh
|
- | - | - | - | - | |
06 | 2.2437: Recover waste heat from equipment | $1,644 | $261 | - |
$1,644
-
MMBtu
|
- | - | - | - | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,432 | $6,714 |
$3,432
65,440
kWh
|
- | - | - | - | - | |
08 | 2.4221: Install compressor air intakes in coolest locations | $553 | $516 |
$553
10,548
kWh
|
- | - | - | - | - | |
09 | 3.5316: Contract a wood pallet recycling company | $40,560 | $500 | - | - | - |
$40,560
-
lb
|
- | - | |
10 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $6,714 | $10,000 | - | - |
$6,714
-
Tgal
|
- | - | - | |
11 | 4.652: Replace existing equipment with more suitable substitutes | $3,000 | $1,323 | - | - | - | - | - | $3,000 | |
TOTAL RECOMMENDED | $73,208 | $21,219 |
$21,572
411,286
kWh
|
$1,644
-
MMBtu
|
$6,714
-
Tgal
|
$40,560
-
lb
|
$(-282.0) | $3,000 | ||
TOTAL IMPLEMENTED | $57,865 | $2,405 |
$17,587
335,298
kWh
|
- | - |
$40,560
-
lb
|
$(-282.0) | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Water Disposal Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs