ITAC Assessment: WV0252
ITAC logo
ITAC Assessment: WV0252
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Fiberglass boats
NAICS
n/a
SIC 3732: Boat Building and Repairing
Sales Range $50
M
to 100
M
# of Employees 150
Plant Area 80,000
ft2
Annual Production 2,496
pieces
Production Hrs. Annual 4,160
hrs
Location (State) Maryland

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $91,492 2,516,828
kWh
Electricity Fees $40,549 -
Natural Gas $60,378 8,999
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $73,208 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $57,865

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Water Disposal Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,414 - $1,414
26,955
kWh
- - - - -
02 2.4239: Eliminate or reduce compressed air usage $8,346 $1,200 $8,346
159,170
kWh
- - - - -
03 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $1,869 $235 $2,151
41,020
kWh
- - - $(-282.0) -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $681 $235 $681
12,972
kWh
- - - - -
05 2.7111: Reduce illumination to minimum necessary levels $4,995 $235 $4,995
95,181
kWh
- - - - -
06 2.2437: Recover waste heat from equipment $1,644 $261 - $1,644
-
MMBtu
- - - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $3,432 $6,714 $3,432
65,440
kWh
- - - - -
08 2.4221: Install compressor air intakes in coolest locations $553 $516 $553
10,548
kWh
- - - - -
09 3.5316: Contract a wood pallet recycling company $40,560 $500 - - - $40,560
-
lb
- -
10 3.6193: Install equipment (eg compactor) to reduce disposal costs $6,714 $10,000 - - $6,714
-
Tgal
- - -
11 4.652: Replace existing equipment with more suitable substitutes $3,000 $1,323 - - - - - $3,000
TOTAL RECOMMENDED $73,208 $21,219 $21,572
411,286
kWh
$1,644
-
MMBtu
$6,714
-
Tgal
$40,560
-
lb
$(-282.0) $3,000
TOTAL IMPLEMENTED $57,865 $2,405 $17,587
335,298
kWh
- - $40,560
-
lb
$(-282.0) -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Water Disposal Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs