ITAC Assessment: CM1023
ITAC logo
ITAC Assessment: CM1023
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Fiberglass and Resin Conduit
NAICS 325211: Plastics Material and Resin Manufacturing
SIC 2821: Plastics Materials, Synthetic Resins, and Nonvulcanizable Elastomers
Sales Range $10
M
to 50
M
# of Employees 55
Plant Area 44,000
ft2
Annual Production 43,160
units
Production Hrs. Annual 6,240
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $100,152 1,290,000
kWh
Electricity Demand $58,800 2,395
kW-mo/yr
Electricity Fees $12,605 -
Natural Gas $78,785 10,014
MMBtu
Waste Disposal Costs
Water Usage $7,304 619
Tgal
TOTAL YEARLY COSTS $257,646
RECOMMENDED SAVINGS* $36,202 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings Administrative Changes Savings
01 2.9114: Use solar heat to make electricty $25,746 $250,973 $25,746
331,627
kWh
- - - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,710 $400 $1,946
25,081
kWh
$1,764
-
kW-mo/yr
- - -
03 2.2135: Repair and eliminate steam leaks $1,313 $105 - - $1,169
-
MMBtu
$144
-
Tgal
-
04 2.2136: Install / repair insulation on steam lines $425 $365 - - $425
-
MMBtu
- -
05 2.8121: Apply for tax-free status for energy purchases $5,008 $8,000 - - - - $5,008
TOTAL RECOMMENDED $36,202 $259,843 $27,692
356,708
kWh
$1,764
-
kW-mo/yr
$1,594
-
MMBtu
$144
-
Tgal
$5,008
TOTAL IMPLEMENTED - - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs