ITAC Assessment: UD0131
ITAC logo
ITAC Assessment: UD0131
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1984
Principal Product AUTOMOTIVE TRIM
NAICS
n/a
SIC 3465: Automotive Stampings
Sales Range $10
M
to 50
M
# of Employees 190
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 6,000
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $197,134 3,005,276
kWh
Natural Gas $204,292 36,583
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $36,587 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $36,587

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $7,171 - $7,171
9,086
kWh
-
02 2.7421: Reduce glazed areas in buildings $17,464 $50,000 - $17,464
-
MMBtu
03 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $3,070 $8,000 $3,070
30,774
kWh
-
04 2.4221: Install compressor air intakes in coolest locations $1,853 $800 $1,853
29,015
kWh
-
05 2.2444: Use hot process fluids to preheat incoming process fluids $2,576 $4,000 - $2,576
-
MMBtu
06 2.2414: Use waste heat from hot flue gases to preheat $4,453 $20,000 - $4,453
-
MMBtu
TOTAL RECOMMENDED $36,587 $82,800 $12,094
68,875
kWh
$24,493
-
MMBtu
TOTAL IMPLEMENTED $36,587 $82,800 $12,094
68,875
kWh
$24,493
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs