Assessment Year | 2023 |
---|---|
Principal Product | Thermoplastic polymers and resins |
NAICS | 325211: Plastics Material and Resin Manufacturing |
SIC | 2821: Plastics Materials, Synthetic Resins, and Nonvulcanizable Elastomers |
Sales Range | $5 M to 10M |
# of Employees | 7 |
Plant Area |
60,000
ft2
|
Annual Production | 2,648,581
units
|
Production Hrs. Annual | 2,210
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $107,652 | 1,205,750 |
kWh
|
$0.089 | |
Electricity Demand | $37,367 | 5,670 |
kW-mo/yr
|
$6.59 | |
Electricity Fees | $7,997 | - |
|
- | |
Natural Gas | $7,338 | 634 |
MMBtu
|
$11.57 | |
Waste Disposal Costs | |||||
Water Usage | $391 | 48 |
Tgal
|
$8.15 | |
Water Disposal | $382 | 64 |
Tgal
|
$5.97 | |
Other Liquid (non-haz) | $49 | 1 |
gal
|
$49.00 | |
TOTAL YEARLY COSTS | $161,176 | ||||
RECOMMENDED SAVINGS* | $12,057 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.4239: Eliminate or reduce compressed air usage | $1,244 | $297 |
$460
5,155
kWh
|
$784
-
kW-mo/yr
|
- | - | - | |
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $760 | - |
$543
6,071
kWh
|
$217
-
kW-mo/yr
|
- | - | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $461 | $952 |
$329
3,686
kWh
|
$132
-
kW-mo/yr
|
- | - | - | |
04 | 2.4113: Install motor voltage controller on lightly loaded motors | $4,227 | $2,191 |
$3,018
33,792
kWh
|
$1,209
-
kW-mo/yr
|
- | - | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,201 | $2,583 |
$631
7,068
kWh
|
$253
-
kW-mo/yr
|
- | $72 | $245 | |
06 | 2.7135: Install occupancy sensors | $170 | $200 |
$140
1,567
kWh
|
- | - | $30 | - | |
07 | 2.3212: Optimize plant power factor | $3,994 | $10,500 | - | - | $3,994 | - | - | |
TOTAL RECOMMENDED | $12,057 | $16,723 |
$5,121
57,339
kWh
|
$2,595
-
kW-mo/yr
|
$3,994 | $102 | $245 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs