Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

38

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Resin, synthetic rubber, and artificial synthetic fibers and filaments manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
OR0791 #04 Y:2024 Install / repair insulation on steam lines $2,079 $5,750
OR0791 #03 Y:2024 Optimize plant power factor $2,606 $17,324
OR0791 #02 Y:2024 Utilize energy-efficient belts and other improved mechanisms $1,032 -
OR0791 #01 Y:2024 Modify facility to avoid excess maintenance costs $29,053 $352,000
OR0788 #06 Y:2024 Install / repair insulation on steam lines $2,489 $150,000
OR0788 #05 Y:2024 Insulate glazing, walls, ceilings, and roofs $3,766 $200,000
OR0788 #04 Y:2024 Reduce infiltration to refrigerated areas; isolate hot equipment from refrigerated areas $6,183 $30,000
OR0788 #03 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $7,448 $150,000
OR0788 #02 Y:2024 Replace hydraulic / pneumatic equipment with electric equipment $25,469 $250,000
OR0788 #01 Y:2024 Install smaller boiler (increase high fire duty cycle) $126,866 $2,500,000
OR0772 #06 Y:2023 Insulate bare equipment $1,312 $5,390
OR0772 #05 Y:2023 Install occupancy sensors $1,740 $3,039
OR0772 #04 Y:2023 Optimize plant power factor $5,801 $7,178
OR0772 #03 Y:2023 Utilize higher efficiency lamps and/or ballasts $7,514 $8,385
OR0772 #02 Y:2023 Size electric motors for peak operating efficiency $9,363 $1,352
OR0772 #01 Y:2023 Use adjustable frequency drive or multiple speed motors on existing system $22,304 $25,167
OR0706 #06 Y:2018 Utilize energy-efficient belts and other improved mechanisms $854 -
OR0706 #05 Y:2018 Reduce fluid flow rates $1,821 $3,221
OR0706 #04 Y:2018 Modify process to reduce material use/cost $8,000 $24,775
OR0706 #03 Y:2018 Use waste heat from hot flue gases to preheat $6,311 $2,097