Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

389

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Other basic inorganic chemical manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
LS2510 #08 Y:2025 Replace boiler $14,158 $66,000
LS2510 #07 Y:2025 Enhance sensitivity of temperature control and cutoff $2,760 $4,900
LS2510 #06 Y:2025 Adjust burners for efficient operation $62,919 $100,000
LS2510 #05 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $28,682 $21,000
LS2510 #04 Y:2025 Use in-process recycling whenever possible $24,480 $14,000
LS2510 #03 Y:2025 Utilize higher efficiency lamps and/or ballasts $1,945 $450
LS2510 #02 Y:2025 Install timers and/or thermostats $287 $50
LS2510 #01 Y:2025 Utilize energy-efficient belts and other improved mechanisms $4,765 $200
LE0589 #07 Y:2024 Replace existing hvac unit with high efficiency model $4,206 $19,974
LE0589 #06 Y:2024 Utilize higher efficiency lamps and/or ballasts $1,173 $4,403
LE0589 #05 Y:2024 Preheat combustion air with waste heat $1,588 $5,000
LE0589 #04 Y:2024 Install occupancy sensors $651 $1,275
LE0589 #03 Y:2024 Install timers and/or thermostats $1,179 $800
LE0589 #02 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $6,428 $3,300
LE0589 #01 Y:2024 Install back-up equipment $125,769 $50,000
AM0937 #05 Y:2024 Use solar heat to make electricty $16,025 $450,534
AM0937 #04 Y:2024 Install occupancy sensors $305 $1,440
AM0937 #03 Y:2024 Use / purchase optimum sized compressor $90,235 $351,150
AM0937 #02 Y:2024 Optimize plant power factor $47,464 $107,580
AM0937 #01 Y:2024 Apply for tax-free status for energy purchases $63,000 $15,000