Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

88

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Petrochemical manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MZ0042 #02 Y:2009 Lower temperature during the winter season and vice-versa $19,660 $18,000
MZ0042 #01 Y:2009 Utilize higher efficiency lamps and/or ballasts $1,975 $4,500
OK0773 #06 Y:2008 Utilize higher efficiency lamps and/or ballasts $81 $425
OK0773 #05 Y:2008 Utilize higher efficiency lamps and/or ballasts $201 $1,887
OK0773 #04 Y:2008 Use photocell controls $1,554 $1,284
OK0773 #03 Y:2008 Repair and eliminate steam leaks $36,076 $2,450
OK0773 #02 Y:2008 Eliminate leaks in inert gas and compressed air lines/ valves $2,800 -
OK0773 #01 Y:2008 Operate boilers on high fire setting $14,770 $22,000
OK0749 #08 Y:2007 Operate boilers on high fire setting $238,762 $50,000
OK0749 #07 Y:2007 Increase amount of condensate returned $181,080 $110,352
OK0749 #06 Y:2007 Reduce the pressure of compressed air to the minimum required $5,461 -
OK0749 #05 Y:2007 Install compressor air intakes in coolest locations $3,286 $1,985
OK0749 #04 Y:2007 Repair and eliminate steam leaks $93,609 $4,680
OK0749 #03 Y:2007 Install / repair insulation on steam lines $126,819 $38,280
OK0749 #02 Y:2007 Reduce excessive boiler blowdown $66,275 $21,000
OK0749 #01 Y:2007 Minimize boiler blowdown with better feedwater treatment $74,106 $206,725
LE0163 #05 Y:2003 Reduce the pressure of compressed air to the minimum required $1,258 -
LE0163 #04 Y:2003 Utilize energy-efficient belts and other improved mechanisms $1,773 -
LE0163 #03 Y:2003 Install / repair insulation on steam lines $5,429 $1,434
LE0163 #02 Y:2003 Insulate bare equipment $11,718 $9,072