| Assessment Year | 2009 |
|---|---|
| Principal Product | chemicals |
| NAICS | 325110: Petrochemical Manufacturing |
| SIC | 2869: Industrial Organic Chemicals, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 120 |
| Plant Area |
150,000
ft2
|
| Annual Production | 500,000
ton
|
| Production Hrs. Annual | 6,000
hrs
|
| Location (State) | Missouri |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $167,500 | 2,431,000 |
kWh
|
$0.069 |
| Other Energy | $324,000 | 27,673 |
MMBtu
|
$11.71 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $589,810 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $543,300 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Water Consumption Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,975 | $4,500 |
$1,405
23,232
kWh
|
$570
-
kW-mo/yr
|
- | - | - | |
| 02 | 2.7221: Lower temperature during the winter season and vice-versa | $19,660 | $18,000 | - | - |
$19,660
-
MMBtu
|
- | - | |
| 03 | 2.7135: Install occupancy sensors | $905 | $905 |
$905
13,122
kWh
|
- | - | - | - | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $23,970 | $214,200 |
$19,458
282,000
kWh
|
$4,512
-
kW-mo/yr
|
- | - | - | |
| 05 | 4.512: Condense operation into one building | $543,300 | $150,000 |
$155,000
2,248,000
kWh
|
- |
$228,000
-
MMBtu
|
$142,000
-
Tgal
|
$18,300
-
Tgal
|
|
| TOTAL RECOMMENDED | $589,810 | $387,605 |
$176,768
2,566,354
kWh
|
$5,082
-
kW-mo/yr
|
$247,660
-
MMBtu
|
$142,000
-
Tgal
|
$18,300
-
Tgal
|
||
| TOTAL IMPLEMENTED | $543,300 | $150,000 |
$155,000
2,248,000
kWh
|
- |
$228,000
-
MMBtu
|
$142,000
-
Tgal
|
$18,300
-
Tgal
|
||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs