ITAC Assessment: MZ0042
ITAC logo
ITAC Assessment: MZ0042
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2009
Principal Product chemicals
NAICS 325110: Petrochemical Manufacturing
SIC 2869: Industrial Organic Chemicals, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 120
Plant Area 150,000
ft2
Annual Production 500,000
ton
Production Hrs. Annual 6,000
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $167,500 2,431,000
kWh
Other Energy $324,000 27,673
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $589,810 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $543,300

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Water Consumption Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,975 $4,500 $1,405
23,232
kWh
$570
-
kW-mo/yr
- - -
02 2.7221: Lower temperature during the winter season and vice-versa $19,660 $18,000 - - $19,660
-
MMBtu
- -
03 2.7135: Install occupancy sensors $905 $905 $905
13,122
kWh
- - - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $23,970 $214,200 $19,458
282,000
kWh
$4,512
-
kW-mo/yr
- - -
05 4.512: Condense operation into one building $543,300 $150,000 $155,000
2,248,000
kWh
- $228,000
-
MMBtu
$142,000
-
Tgal
$18,300
-
Tgal
TOTAL RECOMMENDED $589,810 $387,605 $176,768
2,566,354
kWh
$5,082
-
kW-mo/yr
$247,660
-
MMBtu
$142,000
-
Tgal
$18,300
-
Tgal
TOTAL IMPLEMENTED $543,300 $150,000 $155,000
2,248,000
kWh
- $228,000
-
MMBtu
$142,000
-
Tgal
$18,300
-
Tgal
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs