ITAC Assessment: IC0276
ITAC logo
ITAC Assessment: IC0276
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Water Soluble Film
NAICS 326113: Unlaminated Plastics Film and Sheet (except Packaging) Manufacturing
SIC 3081: Unsupported Plastics Film and Sheet
Sales Range $10
M
to 50
M
# of Employees 89
Plant Area 100,000
ft2
Annual Production 7,416,350
lb
Production Hrs. Annual 8,760
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $194,910 4,378,880
kWh
Electricity Demand $214,964 8,059
kW-mo/yr
Electricity Fees $127,049 -
Natural Gas $904,639 125,797
MMBtu
TOTAL YEARLY COSTS $1,441,562
RECOMMENDED SAVINGS* $507,372 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $125,865

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $36,114 $7,997 $2,238
49,732
kWh
$33,876
-
kW-mo/yr
-
02 2.2136: Install / repair insulation on steam lines $83,404 $10,984 - - $83,404
-
MMBtu
03 2.2437: Recover waste heat from equipment $102,187 $5,165 - - $102,187
-
MMBtu
04 2.2511: Insulate bare equipment $6,347 $3,405 - - $6,347
-
MMBtu
05 2.2511: Insulate bare equipment $1,869 $2,547 - - $1,869
-
MMBtu
06 2.2414: Use waste heat from hot flue gases to preheat $23,020 $4,424 - - $23,020
-
MMBtu
07 2.2511: Insulate bare equipment $12,027 $90 - - $12,027
-
MMBtu
08 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $992 $1,773 $932
20,703
kWh
$60
-
kW-mo/yr
-
09 2.9114: Use solar heat to make electricty $85,492 $1,202,972 $64,237
1,427,494
kWh
$21,255
-
kW-mo/yr
-
10 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $155,920 $1,014,736 $349,435
(-415,994)
kWh
- $(-193,515.0)
-
MMBtu
TOTAL RECOMMENDED $507,372 $2,254,093 $416,842
1,081,935
kWh
$55,191
-
kW-mo/yr
$35,339
-
MMBtu
TOTAL IMPLEMENTED $125,865 $22,386 $2,238
49,732
kWh
$33,876
-
kW-mo/yr
$89,751
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs