Assessment Year | 2023 |
---|---|
Principal Product | Water Soluble Film |
NAICS | 326113: Unlaminated Plastics Film and Sheet (except Packaging) Manufacturing |
SIC | 3081: Unsupported Plastics Film and Sheet |
Sales Range | $10 M to 50M |
# of Employees | 89 |
Plant Area |
100,000
ft2
|
Annual Production | 7,416,350
lb
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Indiana |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $194,910 | 4,378,880 |
kWh
|
$0.045 |
Electricity Demand | $214,964 | 8,059 |
kW-mo/yr
|
$26.67 |
Electricity Fees | $127,049 | - |
|
- |
Natural Gas | $904,639 | 125,797 |
MMBtu
|
$7.19 |
TOTAL YEARLY COSTS | $1,441,562 | |||
RECOMMENDED SAVINGS* | $507,372 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $125,865 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $36,114 | $7,997 |
$2,238
49,732
kWh
|
$33,876
-
kW-mo/yr
|
- | |
02 | 2.2136: Install / repair insulation on steam lines | $83,404 | $10,984 | - | - |
$83,404
-
MMBtu
|
|
03 | 2.2437: Recover waste heat from equipment | $102,187 | $5,165 | - | - |
$102,187
-
MMBtu
|
|
04 | 2.2511: Insulate bare equipment | $6,347 | $3,405 | - | - |
$6,347
-
MMBtu
|
|
05 | 2.2511: Insulate bare equipment | $1,869 | $2,547 | - | - |
$1,869
-
MMBtu
|
|
06 | 2.2414: Use waste heat from hot flue gases to preheat | $23,020 | $4,424 | - | - |
$23,020
-
MMBtu
|
|
07 | 2.2511: Insulate bare equipment | $12,027 | $90 | - | - |
$12,027
-
MMBtu
|
|
08 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $992 | $1,773 |
$932
20,703
kWh
|
$60
-
kW-mo/yr
|
- | |
09 | 2.9114: Use solar heat to make electricty | $85,492 | $1,202,972 |
$64,237
1,427,494
kWh
|
$21,255
-
kW-mo/yr
|
- | |
10 | 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat | $155,920 | $1,014,736 |
$349,435
(-415,994)
kWh
|
- |
$(-193,515.0)
-
MMBtu
|
|
TOTAL RECOMMENDED | $507,372 | $2,254,093 |
$416,842
1,081,935
kWh
|
$55,191
-
kW-mo/yr
|
$35,339
-
MMBtu
|
||
TOTAL IMPLEMENTED | $125,865 | $22,386 |
$2,238
49,732
kWh
|
$33,876
-
kW-mo/yr
|
$89,751
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs