ITAC Assessment: OK0749
ITAC logo
ITAC Assessment: OK0749
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product Synthetic Waxes
NAICS 325110: Petrochemical Manufacturing
SIC 2869: Industrial Organic Chemicals, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 115
Plant Area 5,052,960
ft2
Annual Production 72,000,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $846,262 13,676,800
kWh
Natural Gas $2,658,342 366,199
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $789,398 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,461

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.1242: Minimize boiler blowdown with better feedwater treatment $74,106 $206,725 - $74,106
-
MMBtu
02 2.1241: Reduce excessive boiler blowdown $66,275 $21,000 - $66,275
-
MMBtu
03 2.2136: Install / repair insulation on steam lines $126,819 $38,280 - $126,819
-
MMBtu
04 2.2135: Repair and eliminate steam leaks $93,609 $4,680 - $93,609
-
MMBtu
05 2.4221: Install compressor air intakes in coolest locations $3,286 $1,985 $3,286
53,085
kWh
-
06 2.4231: Reduce the pressure of compressed air to the minimum required $5,461 - $5,461
88,222
kWh
-
07 2.2121: Increase amount of condensate returned $181,080 $110,352 - $181,080
-
MMBtu
08 2.1212: Operate boilers on high fire setting $238,762 $50,000 - $238,762
-
MMBtu
TOTAL RECOMMENDED $789,398 $433,022 $8,747
141,307
kWh
$780,651
-
MMBtu
TOTAL IMPLEMENTED $5,461 - $5,461
88,222
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs