Assessment Year | 2007 |
---|---|
Principal Product | Synthetic Waxes |
NAICS | 325110: Petrochemical Manufacturing |
SIC | 2869: Industrial Organic Chemicals, Not Elsewhere Classified |
Sales Range | $50 M to 100M |
# of Employees | 115 |
Plant Area |
5,052,960
ft2
|
Annual Production | 72,000,000
lb
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Oklahoma |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $846,262 | 13,676,800 |
kWh
|
$0.062 |
Natural Gas | $2,658,342 | 366,199 |
MMBtu
|
$7.26 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $789,398 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $5,461 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.1242: Minimize boiler blowdown with better feedwater treatment | $74,106 | $206,725 | - |
$74,106
-
MMBtu
|
|
02 | 2.1241: Reduce excessive boiler blowdown | $66,275 | $21,000 | - |
$66,275
-
MMBtu
|
|
03 | 2.2136: Install / repair insulation on steam lines | $126,819 | $38,280 | - |
$126,819
-
MMBtu
|
|
04 | 2.2135: Repair and eliminate steam leaks | $93,609 | $4,680 | - |
$93,609
-
MMBtu
|
|
05 | 2.4221: Install compressor air intakes in coolest locations | $3,286 | $1,985 |
$3,286
53,085
kWh
|
- | |
06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $5,461 | - |
$5,461
88,222
kWh
|
- | |
07 | 2.2121: Increase amount of condensate returned | $181,080 | $110,352 | - |
$181,080
-
MMBtu
|
|
08 | 2.1212: Operate boilers on high fire setting | $238,762 | $50,000 | - |
$238,762
-
MMBtu
|
|
TOTAL RECOMMENDED | $789,398 | $433,022 |
$8,747
141,307
kWh
|
$780,651
-
MMBtu
|
||
TOTAL IMPLEMENTED | $5,461 | - |
$5,461
88,222
kWh
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs