| Assessment Year | 2009 |
|---|---|
| Principal Product | Organic Chemicals |
| NAICS | 325110: Petrochemical Manufacturing |
| SIC | 2869: Industrial Organic Chemicals, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 200 |
| Plant Area |
3,049,200
ft2
|
| Annual Production | 150,000,000
lb
|
| Production Hrs. Annual | 8,760
hrs
|
| Location (State) | Oklahoma |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $995,757 | 15,927,086 |
kWh
|
$0.063 |
| Electricity Demand | $62,186 | 10,885 |
kW-mo/yr
|
$5.71 |
| Natural Gas | $1,408,330 | 192,162 |
MMBtu
|
$7.33 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $55,482 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $40,712 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.1212: Operate boilers on high fire setting | $14,770 | $22,000 | - | - |
$14,770
-
MMBtu
|
|
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,800 | - |
$2,800
44,800
kWh
|
- | - | |
| 03 | 2.2135: Repair and eliminate steam leaks | $36,076 | $2,450 | - | - |
$36,076
-
MMBtu
|
|
| 04 | 2.7134: Use photocell controls | $1,554 | $1,284 |
$752
54,522
kWh
|
$802
-
kW-mo/yr
|
- | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $201 | $1,887 |
$201
4,992
kWh
|
- | - | |
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $81 | $425 |
$81
3,784
kWh
|
- | - | |
| TOTAL RECOMMENDED | $55,482 | $28,046 |
$3,834
108,098
kWh
|
$802
-
kW-mo/yr
|
$50,846
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $40,712 | $6,046 |
$3,834
108,098
kWh
|
$802
-
kW-mo/yr
|
$36,076
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs