ITAC Assessment: CO0510
ITAC logo
ITAC Assessment: CO0510
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Magnesium extrusions
NAICS
n/a
SIC 3356: Rolling, Drawing, and Extruding of Nonferrous Metals, Except Copper and Aluminum
Sales Range $50
M
to 100
M
# of Employees 120
Plant Area 112,700
ft2
Annual Production 15,000,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $106,722 6,558,361
kWh
Electricity Demand $251,614 18,398
kW-mo/yr
Electricity Fees $1,602 -
Natural Gas $134,156 20,823
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $17,190 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $15,400

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $9,580 $600 $5,070
262,700
kWh
$4,870
-
kW-mo/yr
- $(-360.0) - -
02 2.2511: Insulate bare equipment $3,600 $1,560 - - $3,600
-
MMBtu
- - -
03 2.4133: Use most efficient type of electric motors $320 $480 $162
8,433
kWh
$158
-
kW-mo/yr
- - - -
04 2.7135: Install occupancy sensors $1,210 $300 $480
24,800
kWh
$730
-
kW-mo/yr
- - - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $580 $1,450 $160
8,300
kWh
$150
-
kW-mo/yr
- - - $270
06 2.8121: Apply for tax-free status for energy purchases $1,900 $250 - - - - $1,900 -
TOTAL RECOMMENDED $17,190 $4,640 $5,872
304,233
kWh
$5,908
-
kW-mo/yr
$3,600
-
MMBtu
$(-360.0) $1,900 $270
TOTAL IMPLEMENTED $15,400 $2,890 $5,232
271,133
kWh
$5,028
-
kW-mo/yr
$3,600
-
MMBtu
$(-360.0) $1,900 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs